Community Cluster
A small village, reconstruction cluster or first-stage development. Start with the housing mix and only add the education, health, community and utility systems the brief actually requires.
Use this scale
RHELGAN · Complete Communities
Five planning scales give project teams a practical place to start. They are not fixed bills of materials: every school, clinic, WASH, water, wastewater and power requirement is sized from the actual population, site and service brief before procurement.
Five programme scales
A small village, reconstruction cluster or first-stage development. Start with the housing mix and only add the education, health, community and utility systems the brief actually requires.
Use this scaleA repeatable housing programme with stronger shared-service planning around education, health, community facilities and utilities.
Use this scaleA community-scale programme where masterplanning, phased utilities, logistics and multi-building coordination become central to the supply brief.
Use this scaleA larger staged development requiring expanded social infrastructure, utility resilience and controlled multi-supplier procurement.
Use this scaleProgramme-scale housing and infrastructure with formal phasing, masterplanning, procurement controls, logistics and operational handover.
Use this scaleConcept planning visuals
The diagrams deliberately show zones and relationships rather than engineered layouts. They help a project team discuss housing clusters, a community core, utilities, roads, open space and future expansion before a site-specific masterplan is commissioned.
Concept planning visual only - symbolic, not to scale. Final road layout, plots, building locations, utilities, drainage, civil works and setbacks are project-specific.
Concept planning visual only - symbolic, not to scale. Final road layout, plots, building locations, utilities, drainage, civil works and setbacks are project-specific.
Concept planning visual only - symbolic, not to scale. Final road layout, plots, building locations, utilities, drainage, civil works and setbacks are project-specific.
Concept planning visual only - symbolic, not to scale. Final road layout, plots, building locations, utilities, drainage, civil works and setbacks are project-specific.
Concept planning visual only - symbolic, not to scale. Final road layout, plots, building locations, utilities, drainage, civil works and setbacks are project-specific.
What gets sized
Household size, accessibility, age profile and programme users determine the facilities required.
Classrooms and supporting spaces are sized from the actual education brief and local requirements — not a generic homes-to-classrooms ratio.
Clinic scope follows the intended service model, staffing, utilities and medical requirements.
Source water, daily demand, storage autonomy, treatment quality and site conditions drive the water pathway.
Population, flows, discharge or reuse requirements and operating capability determine the treatment process.
Actual loads, critical services, autonomy and grid conditions drive solar, battery and generator requirements.
Wind, cyclone, seismic, rainfall, heat, corrosion and flood exposure are project inputs, not assumptions.
Port access, containerisation, lifting, site storage, local labour and construction sequencing are planned before commercial freeze.
RHELGAN project pathway
RHELGAN is a commercial project-supply pathway. Local law, humanitarian standards, professional engineering, donor requirements, public-health requirements and statutory approvals remain project-specific responsibilities unless expressly included in a written scope.
Country, site, homes, users, programme objectives, timing and procurement route.
Map the brief against proven housing and building systems before creating custom designs.
Water, wastewater, power, education and health are calculated from project data and supplier engineering.
Assign foundations, utilities, logistics, installation, commissioning, approvals and operational responsibility.
Package the approved systems into phased procurement, manufacturing, freight and handover schedules.
Start with what you know
Send the country, approximate programme scale, required building types, site conditions and known utility information. RHELGAN can use that to structure the next technical questions.