RHELGAN · SPECIFICATION STARTER
Development & Humanitarian Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
RHELGAN
Development & Humanitarian Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Country, programme owner and procurement/funding pathway
- Population, household count or facility user demand
- Housing / WASH / water / health / education / community building mix
- Climate, hazards, site access and logistics constraints
- Water source, wastewater pathway and daily demand assumptions
- Power source, critical loads, backup strategy and electrical standard
- Accessibility, safeguarding, public-health and local code requirements
- Manufacturing phasing, freight, storage, installation and handover responsibilities
PERFORMANCE / SPECIFICATION CLAUSES
- Programme outcomes and design population
- Building and infrastructure performance criteria
- Climate/resilience and hazard requirements
- Water/WASH demand and service interfaces
- Power and backup-power architecture
- Accessibility and safeguarding interfaces
- Documentation, QA and inspection requirements
- Packing, freight, site receiving and phased rollout
- Installation / commissioning / operator responsibility matrix
REQUIRED EVIDENCE / SUBMITTALS
- Exact building/system technical datasheets and material schedules
- Structural/fire/public-health evidence applicable to the selected system
- Water, sanitation and treatment evidence tied to the exact equipment
- Power/generator certification and exact component documentation
- Factory QA, inspection, packing and traceability plan
- Warranty, manuals, critical spares and operator training scope
- Donor/agency/local statutory requirements recorded separately from product evidence
DRAWING / CAD / BIM REGISTER
- Programme / community concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Programme brief and destination
- Site/masterplan information
- Required buildings/infrastructure quantities
- Performance and evidence requirements
- Utility/service assumptions
- Required drawings/submittals
- Manufacturing/inspection programme
- Packing and logistics strategy
- Warranty, spares, manuals and training
OPERATIONS / MAINTENANCE / HANDOVER
- Asset register by building/system
- Routine WASH and water-system inspection
- Generator/power maintenance schedule
- Consumables and critical spare-parts register
- Cleaning, hygiene and public-health routines
- Defect logging and warranty escalation
- Operator manuals / competency records
- Periodic review against changing programme demand
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.
NEXT STEP
