Project countryNot supplied
Facility / buyer typeSports club / venue
3x3 package directionCompetition 3x3
Commercial / hospitality venue modelNot applicable / standard court
KNOTTR commercial package pathwayNot applicable / standard court
Intended level of playCompetition / tournament
FIBA approval targetNot sure — confirm from project brief
Number of 3x3 courts1 court
Available footprint / site dimensionsNot supplied
Existing base / subfloorExisting concrete / asphalt
Outdoor base / drainage statusNeeds site review
EnvironmentOutdoor
Surface directionFIBA Level 1 competition surface pathway
Basketball equipment scopeComplete hoop / backboard / rim package
Competition / event equipmentIntegrated 3x3 timing + scoring/display review
LightingInclude court-lighting review
Containment / edge systemsReview fencing / ball containment
Spectator / player infrastructureBasic benches / seating review
Hospitality / social interfaceNo hospitality scope / standard court
Venue media / technology3x3 timing + basic scoring only
Weather protectionOpen-air court
Court graphics / brandingApollo / project-branded court graphics
Portability / event usePermanent installation
Project stage / target timingNot supplied
Site, competition and project notesNot supplied
Destination *Not supplied
Multi-site / staged procurementNot supplied
Freight & receivingNot supplied
Local project teamNot supplied
Required standards / evidenceNot supplied
Plans / court layoutsNot supplied
Maintenance & sparesNot supplied
Before final reviewFIBA approval applies to the exact approved system. Apollo matches the quoted surface to its supporting certificate before the project specification is issued.
Court lines are only part of the project: run-off, base flatness, drainage, hoop interface, lighting, containment, spectators, hospitality interfaces and event operations still need to be resolved.
Portable systems require a realistic handling, storage, crew and venue-changeover plan; portable does not mean logistics-free.
Apollo is supply-only. Local civil works, foundations, electrical work, installation, structural review and destination approvals remain project-specific unless expressly included.
This brief organises project information for manual Apollo review. It does not calculate price, approve engineering, certify compliance or transfer local design and installation responsibilities.