Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Submit project RFP

VORDAEN / TECHNICAL PROCUREMENT CENTRE

Plan the complete drilling equipment package.

From rig selection and workover scope to controls, well safety, documentation and international shipment. Use this guide to prepare a structured enquiry for independent project engineering and equipment supply review.

FOUR-STEP PROJECT CHECKLIST

What a complete rig enquiry should cover

01 / PROJECT STEP

Define the well programme

Well purpose and planned depth

Anticipated casing and hole sizes

Drilling loads and fluid programme

Operating climate, access and logistics

02 / PROJECT STEP

Specify the rig package

Mast, substructure and hoisting requirements

Drawworks, power and drive philosophy

Mud pumps, tanks and fluid management

Tubular handling and control systems

03 / PROJECT STEP

Confirm safety and compliance

Buyer-selected standards and inspection criteria

Well-control interface and pressure-control specification

Electrical hazardous-area classification

Independent engineering and local statutory approvals

04 / PROJECT STEP

Plan supply and delivery

Equipment scope and exclusions

Factory inspection and acceptance documentation

Export terms, shipping dimensions and route

Local contractor installation, commissioning and support

SCOPE CLARITY

Equipment supply is not site engineering.

VORDAEN coordinates manufacturer enquiries, technical documentation requests and equipment procurement. Buyers and their qualified local contractors are responsible for well design, equipment suitability decisions, installation, commissioning, permits and operational supervision.

EQUIPMENT PATHWAYS

Explore the technical collections

DRILLING & WELL SERVICING

Reference pages for preliminary discussions

Have a well programme or equipment schedule?

Submit technical requirements and destination details. Final quotations are dependent on manufacturer verification and engineering review.

Send Project RFP
Project