Set-out
Position products around circulation, accessibility, clear zones, planting, lighting, sightlines and the intended use of the space.
International Technical & Specifier Centre / Global
Public-realm products rarely sit in isolation. Foundations, paving, drainage, planting, accessibility and maintenance access all meet at the installation detail.

Direct answer
Use the exact product fixing and foundation information where available, then coordinate it with the project's civil, landscape, accessibility and drainage design. Generic concept imagery is not an installation drawing.
Project decision
Use these points to structure the first project conversation. Final suitability stays tied to the actual site, selected system and local project team.
Position products around circulation, accessibility, clear zones, planting, lighting, sightlines and the intended use of the space.
Surface-mounted, embedded and concrete-foundation products require different civil interfaces. Use the exact product information for final coordination.
Allow access for cleaning, fastener inspection, repainting or component replacement without creating unnecessary demolition of surrounding finishes.
Project brief
Frequently asked
No. Foundations and fixings depend on the exact product, size, loads and site.
Yes. Product information can be coordinated with the project team's landscape and civil documentation.
Not normally. Local civil and installation work remains separately defined.
Next step
Send the site, dimensions, intended use, quantities and known local requirements. Apollo will review the relevant product pathway and keep local engineering, approvals and site-work responsibilities explicit.