Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Facility builder

CAMPUS / HIGH PERFORMANCE · MULTI-FACILITY CAMPUS

University sports precinct.

A coordinated campus programme spanning outdoor fields, courts, training, spectators and future phases.

University sports precinct facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Original editable technical SVG
Six premium sport precinct areas: field systems, courts, indoor arena, venue edge, access loop and phased expansionView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • Sport-specific field and court systems
  • Goals, nets and training equipment
  • Primary sports surfacing and containment
PLUSDeveloped facility
  • Sports lighting and field accessories
  • Grandstands, benches and sheltered spectators
  • Hydration, seating and wayfinding interfaces
COMPLETECoordinated venue supply
  • Venue displays and event systems
  • Covered recreation or sports buildings where suitable
  • Integrated asset renewal and maintenance schedule

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Sport-by-sport dimensions and governing-body competition level
02Site geotechnical, drainage and civil design by local team
03Wind, corrosion, climate and electrical design
04Phased access, inclusion and public circulation

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

LUTHVAR / FACILITY PLANNING LIBRARY

Download the facility planning pack.

Use the guide alongside its matching editable procurement schedule. Each serves a different purpose, and both follow the same facility scope.

These resources support early planning and product procurement. Facility diagrams are not scaled construction drawings. Technical criteria, supplier documents and local statutory requirements must be checked for the exact project. Apollo supplies products only; local specialists undertake engineering, approvals, civil work and installation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

FACILITY PLANNING EXAMPLES

See a potential procurement situation.

Working examples, not real Apollo case studies. Each identifies the product scope and responsibilities relevant to this type of facility.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project