Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Facility builder

GLOBAL SPORTS · EXAMPLE FACILITY PLANNING

A university precinct in three stages

Outdoor sport · campus recreation

A university precinct in three stages facility planning zones

These are hypothetical planning examples. No named customer, project completion, supplier approval, budget or site measurement is implied. Apollo supplies products only; local teams undertake design, engineering, permissions, civil works, installation and commissioning.

Universities & campus sportUniversity sports precinct package

01 · THE BRIEF

Start with the real operating question.

A university is considering a phased upgrade to an existing field, shared courts and an indoor venue while retaining day-to-day access.

Working assumptions

  • Existing surfaces and services need measured surveys
  • User demand and sport standards remain to be confirmed

Facility objectives

  • Maintain participation during upgrades
  • Coordinate shared infrastructure
  • Avoid duplicated equipment procurement

02 · FACILITY RELATIONSHIPS

Coordinate the activity zones.

The facility diagram explains relationships, not surveyed dimensions, sport certification or an approved construction design.

View complete diagram
University sports precinct complete facility zoning diagram

03 · PROJECT SEQUENCE

Three sensible stages.

The stages are decision gates, not calendar estimates or contractual milestones. The appointed local team controls construction sequencing.

01

Survey and programme

  • Map student, competition and public use
  • Review fields, courts, services, access and drainage
02

Playing systems

  • Schedule surfaces, sport equipment and storage
  • Coordinate lighting and containment with local designers
03

Future stages

  • Evaluate seating, displays and covered systems
  • Prepare asset care and renewal programme

04 · WHAT APOLLO COORDINATES

Separate supply from local works.

Product selections require model-specific specifications and the project's applicable standards. Site responsibilities stay with the appointed local team.

Potential Apollo product supply

  • Field and court surfaces
  • Sport equipment and containment
  • Grandstands and lighting
  • Hydration, displays and shade

Local project-team responsibilities

  • Geotechnical, civil, structural and electrical design
  • Approvals, access and local installation

05 · PROCUREMENT OUTPUT

Turn this example into a brief.

The decision below determines what should be resolved before requesting a technically comparable supply quotation.

DECISION TO RESOLVE

Which facilities must stay operational during construction?

Documents to prepare

  • Campus facility brief
  • Site-specific equipment schedule
  • Phased procurement and responsibility matrix

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project