Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Facility builder

PRIMARY / SECONDARY / NETWORKS · INDOOR MULTI-SPORT

School hall renewal.

A practical indoor hall refurbishment around floors, hoops, nets, dividers and changeover.

School hall renewal facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Six numbered facility system areas for School hall renewalView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • Indoor flooring and sport equipment
  • Wall/ceiling interface review
  • Storage and basic changeover
PLUSDeveloped facility
  • Divider curtains and adaptable scoring
  • Compatible lighting and safety zones
  • Shared hall technical drawings
COMPLETECoordinated venue supply
  • Multiple activity configurations
  • Spectator systems and display options
  • Coordinated operations and handover

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Court dimensions, heights and run-off
02Fixings and suspended structural loads
03Floor selection and sport-specific tests
04Local building, electrical and fire review

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project