Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Facility builder

PRIMARY / SECONDARY / NETWORKS · MOVEMENT / PLAY

Primary active campus.

Age-appropriate sport and active recreation with safe circulation and supervision.

Primary active campus facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Six numbered facility system areas for Primary active campusView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • Age-appropriate play and court equipment
  • Suitable surfacing and fall considerations
  • Supervised circulation and space planning
PLUSDeveloped facility
  • RIDEspan programme where appropriate
  • Seating, shade and hydration
  • Equipment storage and maintenance planning
COMPLETECoordinated venue supply
  • Campus-wide activity route
  • Outdoor school recreation zones
  • Expandable active-recreation programme

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Age and ability suitability
02Site access and supervision
03Local safety and accessibility review
04Maintenance and storage

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project