Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Facility builder

CAMPUS / HIGH PERFORMANCE · INDOOR COMPETITION

Campus indoor arena.

Indoor flooring, competition systems, equipment changeover, retractable seating and scoring.

Campus indoor arena facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Six numbered facility system areas for Campus indoor arenaView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • Competition-level court flooring and equipment
  • Goals, backstops or sports nets as specified
  • Storage and changeover systems
PLUSDeveloped facility
  • Dividers, lighting and scoring
  • Spectator seating and access coordination
  • Equipment submittals and marking diagrams
COMPLETECoordinated venue supply
  • Retractable seating, display and AV integration
  • Multi-sport arena operating pathways
  • Major venue specification and handover schedule

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Clear heights, run-off and spectator sightlines
02Floor loads, anchorage and building interfaces
03Competition category and certification evidence
04Emergency access, fire and local building approvals

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project