- RIDEspan modular track option
- Site flow and staging interfaces
- Safety and first-use planning
LOCAL GOVERNMENT / PUBLIC REALM · PUMP TRACK / MOVEMENT
Active recreation destination.
Dedicated movement and wheeled recreation zones with future recreation connections.

FACILITY RELATIONSHIPS
See how the systems connect.
Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.
View full-size facility drawing PACKAGE SCOPE
From essential systems to coordinated facility supply.
Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.
- Amenities, hydration and shade
- Spectator and rest spaces
- Further skill-progression sections
- Destination activity zones
- Connected public recreation assets
- Lifecycle and programme resources
PROJECT-SPECIFIC TECHNICAL CHECKS
Resolve the interfaces before procurement.
These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.
PROCUREMENT CHECKLIST
Documents your project team should prepare.
Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.
TENDER & PROCUREMENT
Request evidence and coordinate supply.
Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.
CONNECTED APOLLO SYSTEMS
Go deeper into the specific products.
FROM FACILITY PLAN TO SUPPLY SCOPE
Build one clear brief for every product decision.
Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.
