Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · 3×3 BASKETBALL · TECHNICAL DIAGRAM PACK

Four vector planning sheets for 3×3 basketball facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

3×3 Basketball planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-3X3-BASKETBALL
SPORT3×3 Basketball
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLAN3×3 BasketballPLAYING AREA18 m PLANNING ENVELOPE14 m PLANNING ENVELOPE15 × 11 m playing-area baselineBASIS18 × 14 m facility-footprint reference used for initial 3×3 planning.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONOutdoor / event vertical coordinationPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYBackstop, shot clock, lighting and event structures
Permanent and temporary-event courts require different anchoring, ballast, wind and power strategies.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environment3×3 BasketballPLAYING / PERFORMANCE CORE01
Backstop + ballast/foundation
02
Shot clock
03
Scorer/event table
04
Barrier + fan-zone edge
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYShot clock · Event scoreboardCOORDINATION NOTESClose spectator edge · Accessible viewing · Shot clock · Event scoreboardFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project