COURT · 3×3 BASKETBALL TECHNICAL CENTRE
A 3×3 facility is not simply half a basketball court. Permanent community courts, commercial-social venues and event courts need their own footprint, drainage, equipment, lighting, scoring, circulation and operational strategy.

INTERACTIVE FACILITY MAP
Select a layer to see why it matters. This is a conceptual coordination map—not a dimensioned court, field, structural or compliance drawing.
FACILITY LEVEL MATRIX
Do not copy elite-event requirements into every community project—or under-specify a competition venue from a school checklist.
Permanent participation court with durable outdoor surface, backstop and practical lighting.
Club / social court with spectator edge, scoring and repeat operating model.
Competition court with exact approved surface/equipment, shot clock and event zoning.
Broadcast/event court with temporary infrastructure, media, audience, display and rapid installation/changeover.
12 TECHNICAL TOPICS
Each topic is part of the same facility. Changing one layer can affect several others, which is why product selection should follow the complete brief.
Use the dedicated 3×3 footprint and free-space requirements rather than simply cutting a 5-on-5 hall in half. Protect player run-off, scorer, bench, spectator and event-service zones.
Outdoor systems should be checked for UV weathering, wet slip, permeability / drainage, thermal expansion and base tolerance. Temporary/event systems need transport, assembly and flatness controls.
Backstop geometry, board/ring, padding and anchoring or ballast must match the exact permanent or event system.
Community lighting and broadcast/event lighting are different briefs. Define hours, spill-light controls, cameras and temporary-event power before fixture selection.
Protect the player boundary while creating close spectator energy. Temporary barriers, seating, fan zones and accessible viewing need defined offsets.
Review pole/foundation or temporary support conditions, scoreboard/display supports, shade/cover and wind exposure.
Outdoor courts need solar orientation, heat expansion, wind, rain and stormwater planning. Avoid tree debris and uncontrolled runoff onto the playing area.
Provide accessible court approach, ramped tile edges where required, inclusive player access and accessible spectator positions.
Event tiles, barriers, backstop components, shot clocks and furniture require transport cases, dry storage, handling routes and an installation sequence.
Shot clock, scoring, PA, FÍSVOR event display, streaming/camera and content-control systems should be tested as one event layer.
Confirm exact FIBA 3×3 Approved surface/equipment where the competition brief requires it; keep product approval separate from local base, electrical and structural work.
Inspect tile movement, edges, drainage, surface wear, backstop stability, pads, fasteners, clocks, cables and spare parts on a defined schedule.
EVIDENCE LADDER
Defines the sport or competition requirement. It does not automatically approve a supplier or construction detail.
Applies to an exact surface, equipment item or system configuration and the scope stated by the governing programme.
Where the sport offers it, field/court/facility testing confirms the finished installation rather than only the product.
Foundations, supports, wind/seismic loads, electrical, building interfaces and local-code compliance remain project-specific.
Warranty, documentation, spares, freight, installation responsibility and exact quoted configuration are closed before order.
SPECIFICATION INPUTS
These inputs can become a consultant brief, RFP schedule or Apollo project review without prematurely inventing an exact model.
Permanent or event court
Competition level
Available footprint
Base and drainage
Surface pathway
Backstop / anchoring method
Lighting hours / broadcast need
Shot clock / scoring / display
Spectator and barrier plan
Storage / transport / installation model
PERFORMANCE-SPECIFICATION STARTERS
These are performance-based starting points, not a substitute for the project architect, engineer, governing body or exact selected-system data.
Use the dedicated 3×3 footprint and free-space requirements rather than simply cutting a 5-on-5 hall in half. Protect player run-off, scorer, bench, spectator and event-service zones.
Outdoor systems should be checked for UV weathering, wet slip, permeability / drainage, thermal expansion and base tolerance. Temporary/event systems need transport, assembly and flatness controls.
Confirm exact FIBA 3×3 Approved surface/equipment where the competition brief requires it; keep product approval separate from local base, electrical and structural work.
Inspect tile movement, edges, drainage, surface wear, backstop stability, pads, fasteners, clocks, cables and spare parts on a defined schedule.
DRAWING ROADMAP
Public planning diagrams can define intent. Exact fabrication, foundation, fixing and model drawings should follow only when the selected system is verified.
TECHNICAL DIAGRAM PACK
Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.
These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.
MAINTENANCE & LIFECYCLE
01Surface cleaning
02Drainage inspection
03Tile edge / expansion checks
04Backstop and padding checks
05Shot-clock functional test
06Lighting inspection
07Event hardware inventory
TROUBLESHOOTING
Check base falls, permeability, blocked drainage and local surface undulation.
Check expansion allowance, edge restraint and installation temperature.
Check anchoring/ballast, base level and hardware.
Check surface condition, contaminants and approved outdoor slip characteristics.
Check position, sun angle, brightness and spectator/player sightline.
Map component packing, court sequence, handling equipment and crew roles.
SPORTS PLANNING CALCULATORS
These are concept-planning tools—not engineering, certification, accessibility or photometric calculators. Every input is visible and editable so assumptions stay explicit.
18 × 14 m facility-footprint reference used for initial 3×3 planning.
This is area arithmetic only. Roll widths, tile modules, seams, line systems, perimeter details and manufacturer-specific waste factors can change the final order quantity.
Not a code or sightline calculation. Final rows, aisles, vomitories, accessible positions, guards, rake and egress must be developed by the project team.
01Confirm the sport and exact competition level.
02Define the playing area plus spectator, camera and officials zones.
03Coordinate luminaire locations with structure, roof services, poles and maintenance access.
04Control glare for players, officials and spectators.
05Confirm local electrical, emergency-lighting and spill-light requirements.
06Define training, match and reduced-energy operating modes where controls support them.
NEXT STEP
Permanent and event courts have different edge, barrier and operational requirements. Verify current FIBA 3×3 requirements for the intended competition level.
PRIMARY GOVERNING REFERENCES
We link to the governing organisation rather than republishing whole standards. Rules, manuals, approval lists and competition requirements change.
Reference review date: 4 October 2026. Governing-body content remains owned and controlled by the relevant organisation. Apollo's summaries are planning aids, not substitutes for the current official rules or local professional advice.
CITE THIS RESOURCE
Apollo NZ Global. 3×3 Basketball Facility Technical Centre. LUTHVAR Global Sports Technical Library, 2026.1. https://apollonzglobal.com/3x3-basketball-systems/facility-technical-centre
Technical reference & source policyPROJECT-SPECIFIC REVIEW
Apollo remains supply-only. Local design, foundations, civil works, installation, statutory approvals and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included.