Skip to main content
Apollo NZ GlobalStart a brief
Industrial doors & loading bays

SYSTEM 03 / Truck interface

Dock Leveller Systems

Dock-levelling concepts developed around the actual vehicle fleet, forklift capacity, load direction, dock geometry and operating conditions. Hydraulic lip, telescopic lip, mechanical and vertical-storing arrangements have different installation and safety implications.

Applications

Where this system fits.

General warehouse loadingHigh-throughput logisticsRefrigerated and controlled-temperature docksRefurbishment of loading areas

01 / Selection inputs

What needs to be understood first.

  • Gross vehicle and forklift movement loads
  • Dynamic rated capacity, point loading and load distribution
  • Truck bed height variation and dock approach geometry
  • Pit dimensions, lip length and vertical travel
  • Working environment and requirements for maintenance access

02 / Indicative supply scope

What the package may include.

  • Selected leveller mechanism and operating controls
  • Lip and deck arrangement, frame and standard safety equipment
  • Pit/load/interface drawing requirements
  • Commissioning and maintenance documentation where available

03 / Documentation to request

Evidence before commitment.

  • Model-specific rated capacities and independent evidence
  • Plan/section/pit drawings and anchoring detail
  • Electrical and hydraulic maintenance diagrams
  • Operating instructions, safety instructions and spares

04 / Local project interfaces

Responsibilities to coordinate.

  • Concrete pit, drainage, surrounding slab and civil engineer
  • Door, shelter and vehicle-restraint control sequence
  • Installer and local lifting/load-safety responsibilities

Project supply, not a certified standard kit. Capacity figures will only be shown after technical verification of the exact model and loading condition. Manufacturer capabilities, maximum sizes, duty ratings, test certificates, drawings and warranties must be verified for the selected equipment before any binding performance claim or order.

Related Apollo pathways

Connect the complete loading-bay scope.

Have dimensions, a layout or a dock schedule?

Start simply or prepare a detailed technical brief if the project has reached specification stage.

Start an enquiry Detailed technical brief
Project