Skip to main content
SKELVARRECORD FOUNDRYStart a release
SKELVARRECORD FOUNDRY

Record Foundry · Multi-Format Releases

One album. Three physical formats. One coordinated release.

A vinyl, CD and cassette run should feel like one release family, not three unrelated manufacturing jobs. SKELVAR coordinates quantities, artwork architecture, proofing and production across formats.

Fictional coordinated vinyl, CD and cassette release family in one visual systemSKELVAR Record Foundry · physical release example
Vinyl + CD + cassetteUnified artwork directionCoordinated production scheduleOne project brief

Release design gallery

See how different physical releases could look and feel.

These are illustrative SKELVAR Record Foundry release designs created to show format, genre, colour, packaging and collector-edition possibilities. Final artwork is supplied or approved by each customer and production specifications are confirmed per project.

Fictional deluxe release combining vinyl, CD, cassette and printed extras
Concept multi-format · collector edition
Fictional premium coloured vinyl release
Concept multi-format · vinyl direction
Fictional premium cassette release with coordinated artwork
Concept multi-format · cassette direction

Physical music, properly managed

Format, manufacture, packaging and delivery in one production brief.

Every project is quoted against format, quantity, runtime, colour, packaging, finishing, current production capacity and destination.

01

Vinyl + CD

Pair the premium large-format edition with an accessible compact physical format.

  • Album LP
  • Replicated audio CD
  • Shared artwork system
  • Format-specific packaging
02

Vinyl + cassette

A strong pairing for independent releases, limited editions and artist merchandise.

  • LP or 7-inch pathway
  • Cassette edition
  • Colour coordination
  • Collector packaging
03

Three-format release

Coordinate the complete physical release from the same project brief.

  • Vinyl
  • Replicated CD
  • Cassette
  • Shared production calendar

Production pathway

Coordinate once, manufacture by format.

Each format has different audio, artwork and production requirements. SKELVAR keeps those differences controlled while preserving one visual and commercial release plan.

See the full production process

Production knowledge centre

Make the manufacturing decisions before the files go to production.

These guides explain the choices that most often affect format, artwork, quantity and production planning. Final templates and factory tolerances are issued only after the exact production route is selected.

How Record Foundry works

SKELVAR manages the production path. Specialist manufacturing partners make the physical product.

We do not present Apollo as the owner of a pressing plant. SKELVAR acts as the project and production-management interface: qualifying the release, coordinating the selected manufacturing route, managing specification and proofing, and keeping the physical formats aligned through production and delivery planning.

Production-ready audioFinal masters are supplied by the customer. Vinyl cutting and production-mastering requirements are confirmed per project.
Manufacturing templatesArtwork is prepared against the selected format, packaging and finishing specification before production approval.
Rights controlledThe customer must own or control the rights needed to reproduce the submitted recordings, artwork and other supplied material.

SKELVAR Record Foundry

Build the physical release.

Connected project pathway

Everything you need to take the next project step.

SKELVAR · Furniture & Living
Planning & specification

Multi-Format Releases: what to define before quotation.

Coordinate vinyl, CD and cassette production as one physical music release with unified artwork, packaging, quantities, proofing and international…

Applications
  • living rooms
  • listening rooms
  • hospitality interiors
  • design-led homes
Specification evidence
  • Verified product specifications or documented product facts
  • Clear applications, limitations and configuration boundaries
  • Project inputs required for manual quotation or technical review
  • Apollo supply-only scope and purchaser/local-project responsibilities
Compare before selecting
  • Dimensions, capacity or coverage required for the real site.
  • Materials, finishes and environmental exposure.
  • Installation, interfaces, services and maintenance access.
  • Technical documents, local approvals and project responsibilities.
Regional project pathwaySKELVAR Furniture & Living for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Start a release

Tell us which formats you want and the target quantity for each one.

Build the release brief
Project