SARENTA · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Coordinate clear-span event, sport, resort, community and commercial structures around use, occupancy, span, clear height, wind/snow where relevant, envelope, openings, fire/acoustic requirements, foundations, logistics and local engineering before the exact structure is released.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Destination, project use and occupancy model

02

Required clear span, length, eave/ridge height and internal clearances

03

Wind, snow where relevant, seismic and other local structural criteria

04

Envelope pathway: membrane, hard wall, glazing, insulation or mixed

05

Openings, doors, loading access and emergency/egress interfaces

06

Fire, acoustics, HVAC, lighting and internal-environment requirements

07

Foundation, anchoring, site levels, drainage and ground conditions

08

Freight, site access, erection sequence and local installation responsibility

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact structural series and material specification

02

Current span/configuration limits tied to the selected system

03

Membrane/material weight and fire-performance evidence where applicable

04

Project structural calculations and drawings for the actual design criteria

05

Connection, anchoring and foundation reactions for local engineering

06

Opening/envelope component evidence for the selected configuration

07

QA, warranty, manuals and inspection/maintenance documentation

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Clear-span structure concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Use/occupancy and design life

02

Plan geometry, span and clear-height requirements

03

Structural design criteria and local professional interfaces

04

Primary frame/material system

05

Roof/wall/envelope and insulation pathway

06

Openings/doors/services coordination

07

Fire/acoustic/HVAC/lighting interfaces

08

Foundation/anchoring and drainage responsibilities

09

Manufacturing, QA, freight, erection and handover

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Project location and use

02

Dimensioned plan/section requirements

03

Design wind/snow/seismic criteria

04

Envelope and insulation schedule

05

Opening/door schedule

06

Services and internal fit-out interfaces

07

Structural evidence and drawing requirements

08

Foundation/anchoring responsibility matrix

09

Freight/site access/erection programme

10

Warranty, inspection and maintenance

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Primary-frame visual inspection

02

Membrane/envelope inspection and cleaning

03

Connection/fastener/anchor inspection

04

Doors/openings/hardware service

05

Drainage and water-management checks

06

Coating/corrosion inspection where relevant

07

Storm/high-wind operating procedure for applicable elements

08

Maintenance log, spare parts and periodic structural review

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project