SARENTA · STRUCTURE SELECTION

Clear-span structure selection for event, sport and project buildings.

Span is only one variable. Occupancy, internal clearances, envelope, climate, doors, services and project duration can change the right structure family.

SHORT ANSWER

Start with the activity and internal volume before choosing the structural form.

Define use/occupancy, required unobstructed span, clear height, length, openings, envelope and local design criteria. Then use the SARENTA selector to narrow the structural family before project-specific calculations and drawings.

KEY PROJECT POINTS

What should drive the decision.

These are project inputs, not substitute engineering or automatic product approvals.

01

Clear span should come from the activity/equipment layout.

02

Eave and ridge height affect usable internal volume.

03

Open-sided covers and enclosed halls are different pathways.

04

Envelope choice changes loads and internal comfort.

05

Large doors/loading access can control bay and frame design.

06

Foundation reactions remain project-specific.

COMPARISON

Use-case fit before product preference.

The table is deliberately directional. Exact configurations still require project and evidence review.

PathwayBest fitWatch closely
Open-sided permanent coverCourts, spectators and weather protection where full enclosure is not required.Wind uplift, drainage, membrane, lighting and edge weather.
Enclosed clear-span hallSport, event, community or commercial use needing a controlled internal environment.Envelope, egress, HVAC, acoustics, fire and large openings.
Temporary / relocatable structureEvents or staged programmes where speed and demountability matter.Anchoring, repeated erection, temporary-occupancy rules and logistics.
01

Define the clear internal volume

Court run-off, stage rigging, equipment, seating, vehicle access or process equipment should determine span and height.

02

Choose enclosure deliberately

Membrane, hard wall, glazing, insulation or mixed envelopes create different comfort, acoustic and structural outcomes.

03

Coordinate openings early

Large doors and emergency exits should be known before frame bays and bracing zones are frozen.

04

Match engineering to the destination

Wind, snow where relevant, seismic and foundation conditions require project-specific calculations and local professional review.

PROJECT INPUTS

What to have ready before asking for the exact system.

A stronger brief shortens the gap between product interest and a useful technical/commercial response.

01

Destination

02

Use/occupancy

03

Clear span

04

Length

05

Eave/ridge/clear height

06

Open/enclosed

07

Envelope type

08

Door/opening schedule

09

Wind/snow/seismic criteria

10

Foundation/ground

11

Services/HVAC

12

Erection/logistics

EVIDENCE BOUNDARY

SARENTA range capability is not a substitute for project structural design.

Published material and span references are system-level planning data. Exact structural series, calculations, drawings, anchoring and foundation reactions must match the actual project.

SARENTA Structure SelectorApollo selector for event, sport, resort and clear-span project structures.

FAQ

Questions project teams usually need answered.

What is the maximum SARENTA clear span?

Selected main-series pathways are published up to 60 m, but exact availability and engineering depend on the chosen structure and project.

Can the same structure be used for sport and events?

Potentially, but clear height, floor, egress, services and occupancy requirements can be very different.

Does Apollo design foundations?

Apollo supplies system data and project reactions where available; local foundation design remains project-specific unless expressly included.

Project