SARENTA · SPECIFICATION STARTER
Architectural Structure Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
SARENTA
Architectural Structure Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Destination, project use and occupancy model
- Required clear span, length, eave/ridge height and internal clearances
- Wind, snow where relevant, seismic and other local structural criteria
- Envelope pathway: membrane, hard wall, glazing, insulation or mixed
- Openings, doors, loading access and emergency/egress interfaces
- Fire, acoustics, HVAC, lighting and internal-environment requirements
- Foundation, anchoring, site levels, drainage and ground conditions
- Freight, site access, erection sequence and local installation responsibility
PERFORMANCE / SPECIFICATION CLAUSES
- Use/occupancy and design life
- Plan geometry, span and clear-height requirements
- Structural design criteria and local professional interfaces
- Primary frame/material system
- Roof/wall/envelope and insulation pathway
- Openings/doors/services coordination
- Fire/acoustic/HVAC/lighting interfaces
- Foundation/anchoring and drainage responsibilities
- Manufacturing, QA, freight, erection and handover
REQUIRED EVIDENCE / SUBMITTALS
- Exact structural series and material specification
- Current span/configuration limits tied to the selected system
- Membrane/material weight and fire-performance evidence where applicable
- Project structural calculations and drawings for the actual design criteria
- Connection, anchoring and foundation reactions for local engineering
- Opening/envelope component evidence for the selected configuration
- QA, warranty, manuals and inspection/maintenance documentation
DRAWING / CAD / BIM REGISTER
- Clear-span structure concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Project location and use
- Dimensioned plan/section requirements
- Design wind/snow/seismic criteria
- Envelope and insulation schedule
- Opening/door schedule
- Services and internal fit-out interfaces
- Structural evidence and drawing requirements
- Foundation/anchoring responsibility matrix
- Freight/site access/erection programme
- Warranty, inspection and maintenance
OPERATIONS / MAINTENANCE / HANDOVER
- Primary-frame visual inspection
- Membrane/envelope inspection and cleaning
- Connection/fastener/anchor inspection
- Doors/openings/hardware service
- Drainage and water-management checks
- Coating/corrosion inspection where relevant
- Storm/high-wind operating procedure for applicable elements
- Maintenance log, spare parts and periodic structural review
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.