Sports clubs and academies
Container functions as secure equipment storage and deployment base
Start Project Brief
Illustrative project visual
DEPLOYABLE · OUTDOOR / HYBRID
Secure container storage with the training floor deployed outside. Field Systems use the container primarily as the transport, storage and deployment hub. Strength, functional and conditioning activity is arranged around the opened unit, making this the more flexible pathway for outdoor and semi-permanent training sites.
PROJECT FIT
Container functions as secure equipment storage and deployment base
Main training activity takes place outside the container
Compact through high-capacity configurations available
Foundation, anchoring and site exposure reviewed per project
CURRENT REFERENCE RANGE
These TORVYR configurations provide a clear starting point for project scoping. Exact equipment, dimensions and project documents are confirmed before quotation.
Compact deployable training and storage pathway for smaller sites.
Reference capacity: 5–10 simultaneous users
Three-opening compact system for higher station density without moving to a full 20 ft platform.
Reference capacity: 8–12 simultaneous users
The core deployable field configuration: secure storage inside, training racks and equipment deployed outside.
Reference capacity: 10–15 simultaneous users
Reference format: 20 ft base container
Adds stairs, rails, corrosion-resistant deck surface and upper-level social / shelter space to the Field 20 concept.
Four-opening field format developed around direct container transport and international shipment pathways.
Adds elevated access, ladder training, safety fencing and an upper leisure / observation area.
Weather-protected variant of the larger field platform with an overhead shade / rain canopy.
Large multi-zone field system with racks on both sides and a tall climbing / rope-training tower.
Heavy 40 ft configuration with all-direction opening and a fast-deployment design concept.
CONFIGURATION CONTROL
Container training systems are supplied to order. Apollo reviews the selected configuration against training use, destination, site access, freight method and project conditions before quotation.
Local foundation design, structural review, anchoring, utility connections, permits, cranage and installation are outside the standard supply-only scope unless expressly added.
TORVYR · FIELD SYSTEMS