Suspended training equipment
Supplier-stated tested load
Start Project Brief
TORVYR OUTDOOR · TECHNICAL CENTRE
This page separates supplier-received technical evidence from items that still require model- or project-specific confirmation before quotation, engineering reliance or public compliance claims.
Construction basis
These points come from supplier Q&A and supporting documents. They still need to be tied to the exact configuration being ordered.
Load information
These are useful screening values, not universal design capacities. Final equipment rating remains tied to the exact component and current evidence.
Supplier-stated tested load
Supplier-stated tested load
Supplier-stated tested load
Supplier-stated tested load
Supplier states static + dynamic load testing
Supplier states calculated only — separate test not yet completed
Documentation received
Still controlled
Evidence scope
TORVYR OUTDOOR