Project Fit
The sport, site, use level, climate and construction requirements are matched to the most suitable turf pathway.
Start Project Brief
Sports Turf Specifier Centre
Resources for consultants, schools, councils, clubs, developers and procurement teams planning artificial sports turf projects. Use this centre to structure the brief, separate evidence stages and identify the project information required before a technical system is selected.
Project information
This information helps identify the most suitable LUTHVAR pathway and the technical documentation required for the project.
Technical review
Technical information is matched to the exact system so the project team can work from current, relevant documentation.
The sport, site, use level, climate and construction requirements are matched to the most suitable turf pathway.
Construction, performance data and system components are checked against the current technical documentation.
Where certification or formal performance evidence applies, the documentation is matched to the exact system and intended use.
The applicable datasheet, specification wording and project-use information are ready for the project team.
Tender & specification guidance
The aim is to make the tender specific enough to protect the playing outcome without importing unsupported product claims.
State sport, level, utilisation, climate, base, drainage, maintenance and evidence requirements before locking a product.
A test or certificate should identify the actual turf and system components it covers. Do not transfer evidence between different constructions.
Where a standard or governing body assesses installed facilities, the product document and the completed-field test are different evidence stages.
Identify who owns civil works, drainage, turf installation, line marking, equipment interfaces and finished-field testing.
Tender and submittal review should use current datasheets, certificates, warranties and installation / maintenance documents.
Base & drainage
Levels, base construction, drainage, edge restraint, shock layer, line marking and installation tolerances can all affect the finished playing surface. Replacement turf should not conceal unresolved settlement, cracking or drainage problems.
Open drainage guideOperations
Surface selection should reflect the maintenance equipment, staffing and operating budget that will actually be available after handover.
Open maintenance guideTechnical resources
Technical datasheets are provided where current system-specific information is available.
Decision Centre
Project applications
Project handover
Upload the site, civil, drainage, tender and existing-field information that applies. The exact system can then be reviewed against current technical evidence.