Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Start Project Brief
← Technical Centre

Water management

Sports Turf Drainage

Good artificial turf cannot compensate for a field that does not manage water correctly. Surface, base and site drainage need to be considered together.

LUTHVAR Technical Guidance

Drainage review should start with the site and supporting construction, not with a headline permeability figure for the turf alone.

Surface drainage

Water must be able to move through or across the playing surface as intended by the selected construction. Seams, infill, contamination and maintenance can all influence real-world drainage behaviour.

Base drainage

The prepared base and drainage network need to receive and discharge water without creating soft spots, ponding or trapped moisture.

  • Review finished falls and tolerances
  • Understand sub-base permeability
  • Coordinate collector drains and discharge points
  • Allow for local rainfall intensity and site constraints

Replacement fields

Replacing turf does not repair an underlying drainage problem. Existing-field projects should review historic ponding, blocked drains, settlement and base movement before the new surface is installed.

Tropical and high-rainfall sites

Heavy rainfall and high humidity increase the importance of drainage capacity, maintenance access and contamination control.

US school and municipal drainage procurement

For US districts, colleges and parks, distinguish turf permeability from the engineered stormwater system. The local designer should confirm the rainfall design basis, soil and subgrade evidence, falls, collector drainage, permitted discharge route and inspection access. Supplier RFQs should ask for test methods and units for the exact turf, infill and shock-layer build-up; laboratory sample results do not certify whole-field drainage.

Permeability figures versus field performance

A laboratory permeability value for a turf sample does not establish the drainage capacity of the entire installed field. Review the selected surface, infill or non-infill construction, shock layer, base, collector drainage and lawful discharge route together. Request the test method, units and exact construction whenever a permeability figure is supplied.

Evidence to request before a quotation

Ask the project engineer or local contractor for site levels, existing drainage plans, known ponding locations, base or sub-base information, intended sports usage, rainfall design basis and discharge constraints. Apollo can then review turf-system supply suitability; civil drainage design, groundworks, installation and local approvals remain the responsibility of the appointed local team.

Sports turf drainage RFQ: US and international projects

For a school district, municipal field or sports club, specify whether the project is a new field or an existing-field replacement. Request the playing-area dimensions and sport, a site survey, current subgrade and base details, available drainage drawings, known ponding history and the locally required design-storm and permitted discharge criteria. A turf-supplier permeability result should identify the laboratory test method and tested construction; it cannot replace the civil engineer’s site drainage calculations. Compare only complete, compatible turf, infill, shock-layer and drainage configurations before ordering.

Sports turf drainage: what should buyers specify?

A sports turf drainage system is more than the permeability of the visible turf. The project team should review rainfall intensity, surface falls, the base and sub-base, drainage collection and outfall, and how the full field construction deals with water. A supplier product sheet does not replace a local stormwater or civil-engineering assessment.

  • Identify the intended sports, field size, country and local rainfall and flood conditions.
  • Document existing base layers, any standing-water issues, and whether this is a new field or replacement.
  • Ask which drainage and permeability evidence applies to the precise proposed turf, infill and shock-layer construction.
  • Confirm that a local engineer or contractor is responsible for groundworks, collection drains, stormwater connections and statutory approvals.

For a comparable supply quotation, provide the field dimensions, layout, drainage context and technical requirements. Apollo supplies selected products and available manufacturer documents, not local civil design or construction.

From drainage guidance to product selection

Compare artificial sports turf systems Open turf specifier centre Request a project supply review Sports-facility wholesale distributors

Sports turf construction in NZ: what belongs to the surface supplier and what belongs to the field contractor?

A synthetic sports field is a complete construction. Turf, any infill and shock or elastic layer must work with the prepared base, falls, drainage collectors, permissible outfall and maintenance plan. The correct construction differs between a new field and resurfacing an existing one. Apollo does not undertake field building or civil drainage design; independent NZ project professionals are responsible for site-specific work and approvals.

New sports field

Begin with the sport and level of play, field footprint, survey, ground conditions, proposed base formation, rainwater strategy, available discharge, access and desired handover dates. Ask the appointed local engineer and contractor to define the field construction and local stormwater requirements before the turf package is confirmed.

Replacing an existing synthetic field

Do not assume a like-for-like carpet replacement is possible. Identify historic puddling, settlements, contamination, damaged seams and the present shockpad condition. The purchaser's specialists need to check whether the base and drainage still support the new exact turf system and required field performance.

What to request in a turf supply quotation

Supply enquiries should identify field area, primary and secondary sports, expected use, existing surface and base condition, required testing, selected turf/infill/shock-layer scope, delivery town, nominated installer and the evidence required before approval. Test values or certification from one surface build-up cannot automatically be transferred to another.

NZ sports turf systems and rugby/football/hockey choices

Send a field base and turf supply brief

Field development and refurbishment

Start with the correct field project type.

New-field supply and resurfacing can share a turf material family but need different evidence about the ground beneath it. The questionnaire will carry the selected pathway and drainage questions into your project brief.

New field or sports ground · Prepare supply brief Replace an existing artificial turf field · Prepare supply brief

Drainage and outfall calculations, civil works and site approvals remain with the appointed local designer and contractor. Apollo can review compatible turf supply and available product test evidence.

SPORTS PROJECT SUPPLY · UNITED STATES & CANADA

USA & Canada synthetic turf drainage and field planning

Sports directors, municipal facility teams, contractors and civil designers should consider turf permeability, sub-base drainage and discharge as one site-specific system.

USA field projects

Check rainfall, existing ponding, collector drains, base levels and receiving drainage infrastructure.

Canada field projects

Assess snowmelt, freeze-thaw exposure, seasonal operations and the local civil-drainage approach.

Field specification

Provide survey levels, drainage drawings, history of failed areas, sport, field size and climate exposure.

Product supply and available technical documentation only. Local teams manage engineering, installation, approvals and commissioning.

USA sports projects →Canada sports projects →

Evidence stays tied to the exact construction.

Technical guidance explains the decision framework. Final dimensions, materials, test values, warranties, performance classifications and certification statements are confirmed only for the exact project system supported by current documentation.

Continue technical planning

Infill, Reduced-Infill & Non-InfillShock Pads & Elastic LayersNew Field vs Resurfacing
Project