Surface drainage
Water must be able to move through or across the playing surface as intended by the selected construction. Seams, infill, contamination and maintenance can all influence real-world drainage behaviour.
Base drainage
The prepared base and drainage network need to receive and discharge water without creating soft spots, ponding or trapped moisture.
- Review finished falls and tolerances
- Understand sub-base permeability
- Coordinate collector drains and discharge points
- Allow for local rainfall intensity and site constraints
Replacement fields
Replacing turf does not repair an underlying drainage problem. Existing-field projects should review historic ponding, blocked drains, settlement and base movement before the new surface is installed.
Tropical and high-rainfall sites
Heavy rainfall and high humidity increase the importance of drainage capacity, maintenance access and contamination control.
US school and municipal drainage procurement
For US districts, colleges and parks, distinguish turf permeability from the engineered stormwater system. The local designer should confirm the rainfall design basis, soil and subgrade evidence, falls, collector drainage, permitted discharge route and inspection access. Supplier RFQs should ask for test methods and units for the exact turf, infill and shock-layer build-up; laboratory sample results do not certify whole-field drainage.
Permeability figures versus field performance
A laboratory permeability value for a turf sample does not establish the drainage capacity of the entire installed field. Review the selected surface, infill or non-infill construction, shock layer, base, collector drainage and lawful discharge route together. Request the test method, units and exact construction whenever a permeability figure is supplied.
Evidence to request before a quotation
Ask the project engineer or local contractor for site levels, existing drainage plans, known ponding locations, base or sub-base information, intended sports usage, rainfall design basis and discharge constraints. Apollo can then review turf-system supply suitability; civil drainage design, groundworks, installation and local approvals remain the responsibility of the appointed local team.
Sports turf drainage RFQ: US and international projects
For a school district, municipal field or sports club, specify whether the project is a new field or an existing-field replacement. Request the playing-area dimensions and sport, a site survey, current subgrade and base details, available drainage drawings, known ponding history and the locally required design-storm and permitted discharge criteria. A turf-supplier permeability result should identify the laboratory test method and tested construction; it cannot replace the civil engineer’s site drainage calculations. Compare only complete, compatible turf, infill, shock-layer and drainage configurations before ordering.
