PRIMARY / SECONDARY / NETWORKS · MULTI-SITE PROGRAMME

School network procurement.

A repeatable equipment and renewal schedule for school groups or district purchasing.

School network procurement facility overview

FACILITY RELATIONSHIPS

See how the systems connect.

Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.

Six numbered facility system areas for School network procurementView full-size facility drawing

PACKAGE SCOPE

From essential systems to coordinated facility supply.

Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.

COREParticipation essentials
  • Site-by-site equipment schedule
  • Common functional specifications
  • Inspection and replacement priorities
PLUSDeveloped facility
  • Compatible products across several campuses
  • Grouped logistics and component spares
  • Standardized technical return schedules
COMPLETECoordinated venue supply
  • Network-wide phased supply programme
  • Asset lifecycle and upgrade sequence
  • Multi-site delivery responsibilities

PROJECT-SPECIFIC TECHNICAL CHECKS

Resolve the interfaces before procurement.

These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.

01Existing conditions vary between schools
02Site-specific approval and installation
03Substitution and bid comparability
04Delivery and receiving by location

PROCUREMENT CHECKLIST

Documents your project team should prepare.

01Facility and user programme
02Existing-site drawings and photographs
03Applicable sport and local compliance criteria
04Equipment and interface schedule
05Technical submittal and evidence requirements
06Supply, exclusions and local responsibilities
07Freight, receiving and delivery requirements
08Maintenance, spares and staged expansion

Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.

TENDER & PROCUREMENT

Request evidence and coordinate supply.

Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.

FACILITY PLANNING EXAMPLES

See a potential procurement situation.

Working examples, not real Apollo case studies. Each identifies the product scope and responsibilities relevant to this type of facility.

CONNECTED APOLLO SYSTEMS

Go deeper into the specific products.

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project