- School sport surface selection
- Basketball, netball and compatible court equipment
- Containment, safe access and storage
PRIMARY / SECONDARY / NETWORKS · COURTS / DAILY USE
School multi-sport upgrade.
Upgrade school courts and shared-use spaces around teaching programmes, break-time activity and supervised community use.

FACILITY RELATIONSHIPS
See how the systems connect.
Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.
View full-size facility drawing PACKAGE SCOPE
From essential systems to coordinated facility supply.
Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.
- Court lighting and durable site amenities
- Additional training and coaching equipment
- Spectator and supervision zones
- Coordinated outdoor and indoor school sport spaces
- RIDEspan or active-recreation systems when suitable
- Multi-stage renewal and school network scheduling
PROJECT-SPECIFIC TECHNICAL CHECKS
Resolve the interfaces before procurement.
These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.
PROCUREMENT CHECKLIST
Documents your project team should prepare.
Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.
Download the facility planning pack.
Use the guide alongside its matching editable procurement schedule. Each serves a different purpose, and both follow the same facility scope.

School multi-sport upgrade
Shared-use school sport, safety, supervision, storage and staged procurement.
These resources support early planning and product procurement. Facility diagrams are not scaled construction drawings. Technical criteria, supplier documents and local statutory requirements must be checked for the exact project. Apollo supplies products only; local specialists undertake engineering, approvals, civil work and installation.
TENDER & PROCUREMENT
Request evidence and coordinate supply.
Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.
FACILITY PLANNING EXAMPLES
See a potential procurement situation.
Working examples, not real Apollo case studies. Each identifies the product scope and responsibilities relevant to this type of facility.
CONNECTED APOLLO SYSTEMS
Go deeper into the specific products.
FROM FACILITY PLAN TO SUPPLY SCOPE
Build one clear brief for every product decision.
Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.
