GLOBAL SPORTS · EXAMPLE FACILITY PLANNING

A school serving around 900 pupils

PE · recreation · shared use

A school serving around 900 pupils facility planning zones

These are hypothetical planning examples. No named customer, project completion, supplier approval, budget or site measurement is implied. Apollo supplies products only; local teams undertake design, engineering, permissions, civil works, installation and commissioning.

01 · THE BRIEF

Start with the real operating question.

A hypothetical secondary school with approximately 900 students wants to renew its outdoor courts for PE, break-time activity and supervised community use.

Working assumptions

  • 900 is an example enrolment, not a real client
  • Dimensions, drainage and line markings have not been surveyed

Facility objectives

  • Make multiple sports usable without confusing linework
  • Retain safe supervision and accessible routes
  • Make maintenance straightforward

02 · FACILITY RELATIONSHIPS

Coordinate the activity zones.

The facility diagram explains relationships, not surveyed dimensions, sport certification or an approved construction design.

View complete diagram
School multi-sport upgrade complete facility zoning diagram

03 · PROJECT SEQUENCE

Three sensible stages.

The stages are decision gates, not calendar estimates or contractual milestones. The appointed local team controls construction sequencing.

01

Site assessment

  • Confirm sports timetable and age groups
  • Survey run-offs, drainage, fencing and equipment
02

Equipment choices

  • Select correct sport layouts and surfacing
  • Coordinate hoops, posts and lockable storage
03

Staging

  • Plan works around school operation
  • Document local installation and inspections

04 · WHAT APOLLO COORDINATES

Separate supply from local works.

Product selections require model-specific specifications and the project's applicable standards. Site responsibilities stay with the appointed local team.

Potential Apollo product supply

  • School sport surfacing
  • Compatible court equipment
  • Fencing and storage
  • Verified site lighting options

Local project-team responsibilities

  • Safety, safeguarding and accessibility
  • Civil design, line marking, installation and electrical

05 · PROCUREMENT OUTPUT

Turn this example into a brief.

The decision below determines what should be resolved before requesting a technically comparable supply quotation.

DECISION TO RESOLVE

Which sports must share the same surface?

Documents to prepare

  • School requirements brief
  • Sport-specific layout checklist
  • Equipment and works schedule

FROM FACILITY PLAN TO SUPPLY SCOPE

Build one clear brief for every product decision.

Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.

Project