- Condition and replacement schedule
- Sports surface renewal options
- Replacement equipment and safety review
LOCAL GOVERNMENT / PUBLIC REALM · ASSET RENEWAL
Municipal facility renewal.
Replace or upgrade ageing playing systems across several council facilities.

FACILITY RELATIONSHIPS
See how the systems connect.
Six coordinated facility areas, with a common numbering system used throughout planning and procurement. Layouts are not to scale.
View full-size facility drawing PACKAGE SCOPE
From essential systems to coordinated facility supply.
Core, Plus and Complete are scope levels, not fixed product SKUs or pre-engineered installations. Product availability and compatibility are confirmed during project review.
- Lighting, spectator and containment upgrades
- Grouped product documentation
- Standardized tender schedules
- Multi-site coordinated procurement
- Phased asset lifecycle programme
- Long-term operating guidance
PROJECT-SPECIFIC TECHNICAL CHECKS
Resolve the interfaces before procurement.
These are review topics, not a substitute for design approvals, governing-body interpretation or site engineering.
PROCUREMENT CHECKLIST
Documents your project team should prepare.
Apollo provides wholesale and project product supply only. Local project teams are responsible for site investigation, design, engineering, approvals, foundations, electrical and civil works, installation, testing and commissioning. All selections are subject to project-specific verification and quotation.
TENDER & PROCUREMENT
Request evidence and coordinate supply.
Use the facility-specific procurement input, editable schedules and secure enquiry/upload process.
CONNECTED APOLLO SYSTEMS
Go deeper into the specific products.
FROM FACILITY PLAN TO SUPPLY SCOPE
Build one clear brief for every product decision.
Choose your facility, required systems and project destination. Export a working scope or save it to Apollo's project workspace before requesting a tailored supply quotation.
