Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · SKATE & BMX · TECHNICAL DIAGRAM PACK

Four vector planning sheets for skate & bmx facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Skate & BMX planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-SKATE-BMX
SPORTSkate & BMX
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · FACILITY-SYSTEM PLANNING PLANSkate / BMX riding-flow diagram01Riding features / modules02Entry / exit zones03Progression / skill zones04Maintenance accessNO SINGLE UNIVERSAL RECTANGLE IS SHOWN FOR THIS FACILITY TYPE.01 · Pump tracks, skate street/park and BMX race/freestyle are separate facility types with different geometry.02 · Rider flow, progression and fall/runout zones should be designed before individual features are placed.03 · Drainage and routine inspection are primary safety inputs for wheeled-recreation facilities.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONRiding feature + fall / runout sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYTransitions, landings, runout, drainage and spectator separation
Pump tracks, skate features and BMX disciplines use different geometry, but all require controlled rider flow, safe runout, drainage, inspection access and spectator separation.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentSkate & BMXPLAYING / PERFORMANCE CORE01
Riding features / modules
02
Entry / exit zones
03
Progression / skill zones
04
Maintenance access
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYTiming · CamerasCOORDINATION NOTESFall / runout exclusion · Waiting / staging · Timing · CamerasFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project