Skate & BMX
Facility Specification Pack

Wheeled-recreation facilities need flow, progression, fall zones, drainage, rider separation and inspection to work together. Pump tracks, skatepark street/park systems and BMX racing/freestyle are different disciplines and should not be collapsed into one generic ramp layout.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERSkate & BMX Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

Community recreation facility with beginner progression, supervision strategy and durable surfaces.

02Clubs · academies · universities

Club / academy

Club / skills venue with progression zones, lighting, storage and repeat programme use.

03Regional · national competition

Competition

Competition-capable discipline-specific venue using current World Skate/UCI requirements.

04International · professional · broadcast

Elite / major venue

Major event / destination riding venue with spectators, timing/display, media and professional operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Separate pump-track loops, skate street/park zones, BMX race/freestyle or other riding disciplines before fixing geometry; each has different flow and safety requirements.

02

surface

Surface continuity, grip, drainage, transitions and impact durability are fundamental to rider control and maintenance.

03

equipment

Modules, features, rails, coping, start gates or discipline-specific equipment need exact product/competition evidence where applicable.

04

lighting

Avoid glare and deep shadows on transitions, landings, rails and route changes; event/video use adds vertical-lighting needs.

05

spectators

Separate riding lines and fall/runout zones from viewing, waiting and circulation.

06

structure

Modules, ramps, start structures, lighting and spectator elements require foundation/anchoring and structural review.

07

environment

Rain, frost, heat, UV, leaves/debris and drainage materially change riding safety and maintenance.

08

accessibility

Inclusive public-realm access, viewing and beginner/adaptive programming should be considered at facility level.

09

storage

Maintenance tools, modular spares, event/timing equipment and mobile features need secure storage and service access.

10

technology

Timing, lap/ride data, cameras, FÍSVOR, PA and access systems can support competitions and commercial venues.

11

evidence

World Skate facility certification distinguishes recreational and competition skatepark classes; UCI publishes separate 2026 BMX Racing and Freestyle regulations.

12

lifecycle

Inspect riding surfaces, joins, modules, rails/coping, drainage, lighting, signage and spectator barriers; close unsafe features until repaired.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Primary riding discipline

02

User age / skill range

03

Recreation / competition target

04

Site levels

05

Surface / module system

06

Drainage

07

Lighting

08

Spectators

09

Timing / displays

10

Maintenance access

11

Future expansion

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Flow / route plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Feature / transition plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Fall/runout zones

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Surface/drainage section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Spectator/barrier plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Maintenance access

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Event/timing layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Surface inspection

02

Transitions/joins

03

Rails/coping/features

04

Drainage

05

Lighting

06

Signage/barriers

07

Timing

08

Debris cleaning

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Standing water

Review drainage, low points and blocked outlets.

02

Abrupt / unsafe transition

Inspect module alignment, deformation and geometry.

03

Surface becomes slippery

Remove contamination/debris and inspect finish.

04

Rider conflicts

Review route flow, entry/exit and mixed-skill zoning.

05

Loose feature / rail

Close feature and inspect anchors/structure.

06

Event spectators enter riding zone

Improve barriers, circulation and event controls.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

World Skate Skatepark Facility Certification

Official certification rules distinguish recreational and competition skatepark classes for indoor/outdoor facilities.

UCI Regulations

Current 2026 UCI regulations include separate BMX Racing and BMX Freestyle rules.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project