Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · NETBALL · TECHNICAL DIAGRAM PACK

Four vector planning sheets for netball facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Netball planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-NETBALL
SPORTNetball
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANNetballPLAYING AREA36.6 m PLANNING ENVELOPE21.35 m PLANNING ENVELOPE30.5 × 15.25 m playing-area baselineBASIS30.5 × 15.25 m playing court with an editable 3.05 m planning surround on all sides.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONIndoor / outdoor netball sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGY3.05 m goalpost height reference
Indoor halls must coordinate goalposts, roof services, lighting, scoreboards and divider systems without borrowing basketball assumptions.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentNetballPLAYING / PERFORMANCE CORE01
Goalpost sleeves / bases
02
Team benches
03
Officials / scorer
04
Post storage
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScoreboard / timing · PACOORDINATION NOTESSideline viewing · Covered viewing / arena seating · Scoreboard / timing · PAFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project