Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · HANDBALL · TECHNICAL DIAGRAM PACK

Four vector planning sheets for handball facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Handball planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-HANDBALL
SPORTHandball
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANHandballPLAYING AREA44 m PLANNING ENVELOPE24 m PLANNING ENVELOPE40 × 20 m playing-area baselineBASIS40 × 20 m playing court with editable 2 m planning allowance.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONGoal / protection / arena sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGY3 × 2 m goal reference + restraint / wall protection
Goal stability, wall protection, team zones, lighting and arena seating need one coordinated hall section.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentHandballPLAYING / PERFORMANCE CORE01
Goals + restraint
02
Team benches
03
Scorer / time-out
04
Wall protection
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScore + clock · Timeout systemsCOORDINATION NOTESSafety envelope · Arena seating · Score + clock · Timeout systemsFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project