Handball
Facility Specification Pack

Handball combines a large indoor court, fast play, powerful goal impacts and substantial spectator/event infrastructure. Goal restraint, wall protection and shared-hall changeover need to be designed rather than improvised.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERHandball Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/training hall with safe goals, resilient floor and wall protection.

02Clubs · academies · universities

Club / academy

Club hall with repeat goal handling, team zones, scoreboard and spectators.

03Regional · national competition

Competition

Competition hall with exact court/equipment, lighting, officials and event infrastructure.

04International · professional · broadcast

Elite / major venue

Arena with major seating, FÍSVOR, broadcast lighting, media and professional operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Protect court, goal areas, safety/run-off, team/substitution zones and officials positions before spectator or shared-use overlays.

02

surface

Use a resilient, flat, consistent indoor floor with line marking and protection matched to handball and secondary sports.

03

equipment

Goals, nets, restraint/anchoring, padding/protection and handling trolleys must be exact, safe systems.

04

lighting

Coordinate high-speed ball visibility, uniformity, glare and broadcast camera requirements.

05

spectators

Separate spectator and team circulation, accessible viewing and arena seating from player safety zones.

06

structure

Goal anchors/restraint, wall protection, dividers, displays, lighting and roof services all interact.

07

environment

Ventilation and thermal comfort should avoid strong draughts and condensation on the playing surface.

08

accessibility

Accessible spectators and venue circulation should be planned outside the safety envelope and team zones.

09

storage

Goals, nets, benches, protection and divider equipment need large, nearby storage and safe handling routes.

10

technology

Game clock, scoreboards, electronic timeout systems, FÍSVOR and PA should be coordinated with officials/control positions.

11

evidence

Use current IHF Rules of the Game and court/goal guidelines; exact equipment and local structural evidence remain separate.

12

lifecycle

Inspect goals/restraint, nets, floor, wall protection, scoring, dividers and seating after repeated use/changeovers.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Competition level

02

Court/safety envelope

03

Floor

04

Goals/restraint

05

Wall protection

06

Team/official zones

07

Lighting

08

Scoring/time-out

09

Spectators

10

Storage/changeover

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Court plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Goal restraint detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Wall protection elevations

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Team/substitution/scorer layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Seating plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Storage route

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Floor

02

Goals/restraint

03

Nets

04

Padding/wall protection

05

Score/time-out equipment

06

Lighting

07

Dividers

08

Seating

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Goal movement

Check anchor/restraint and frame.

02

Wall impact risk

Review safety distance and protection.

03

Floor contamination/slip

Check cleaning and footwear/adhesive contamination.

04

Score/time-out failure

Check power, controls and protocol.

05

Storage damage

Review trolleys, doors and stacking.

06

Glare

Review fixtures and reflective surfaces.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

IHF Regulations & Documents

Current Indoor Handball Rules of the Game, court/goal guidelines and related regulations.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project