LUTHVAR · FUTSAL · TECHNICAL DIAGRAM PACK

Four vector planning sheets for futsal facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Futsal planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-FUTSAL
SPORTFutsal
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · DIMENSIONED PLANNING PLANFutsalPLAYING AREA44 m PLANNING ENVELOPE24 m PLANNING ENVELOPE40 × 20 m playing-area baselineBASIS40 × 20 m common full-size planning reference with editable 2 m peripheral allowance.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONGoal / wall / hall sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGY3 × 2 m goal reference + wall protection interface
Fast ball movement makes wall proximity, goal restraint, lighting and spectator protection critical hall interfaces.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentFutsalPLAYING / PERFORMANCE CORE01
Goals + restraint
02
Team benches
03
Scorer / timekeeper
04
Wall protection
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYGame clock · ScoreboardCOORDINATION NOTESRun-off edge · Barrier / seating · Game clock · ScoreboardFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.