Futsal
Facility Specification Pack

A futsal hall needs to manage fast ball movement, goal restraint, wall proximity, floor performance, team areas and spectator/event infrastructure without compromising shared-hall operation.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERFutsal Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/training hall with safe goals, resilient floor, wall protection and storage.

02Clubs · academies · universities

Club / academy

Club hall with repeat goal handling, team areas, scoreboard and spectators.

03Regional · national competition

Competition

Competition-oriented hall with controlled pitch, exact goal evidence, event lighting and officials.

04International · professional · broadcast

Elite / major venue

Arena/event pathway with major seating, FÍSVOR, broadcast lighting and professional operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Freeze the intended competition dimensions, run-off, team/substitution zones, scorer/timekeeper and goal location before adding seating or wall systems.

02

surface

Use a flat, consistent indoor sports floor matched to intended competition and shared sport mix; control slip, ball behaviour, seams and protection.

03

equipment

Goals require exact geometry, nets and restraint/anchoring. Portable goals must have a safe movement and storage method.

04

lighting

Coordinate fast ball visibility, glare, cameras and shared-hall modes.

05

spectators

Keep seating and circulation outside run-off while protecting spectator areas from fast balls where needed.

06

structure

Goal anchors/restraint, wall protection, dividers, scoreboard/display, lighting and roof services should be resolved together.

07

environment

Indoor thermal comfort and ventilation should avoid strong draughts across play. Urban outdoor/cage formats require drainage, UV and noise planning.

08

accessibility

Accessible spectator, player and community-use routes must not compromise run-off or emergency circulation.

09

storage

Goals, nets, benches, protection, dividers and scorer equipment are bulky; show their parked dimensions and movement route.

10

technology

Game clock, scoreboard, FÍSVOR, PA and camera systems should share a clear officials/control architecture.

11

evidence

Keep FIFA/IHF-style goal dimensions or local competition requirements distinct from exact goal product evidence and structural restraint.

12

lifecycle

Inspect floor, goals, nets, restraint hardware, wall padding, score systems and storage equipment.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Competition format

02

Pitch dimensions

03

Floor system

04

Goal type/restraint

05

Run-off / wall proximity

06

Protection/dividers

07

Lighting

08

Team/official zones

09

Scoring / FÍSVOR

10

Spectator capacity

11

Storage

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Pitch/run-off plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Goal restraint detail

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Wall-protection elevation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Team/scorer layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Seating/barrier plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Storage/changeover plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Floor clean

02

Goal frame/fastener inspection

03

Net replacement

04

Restraint/anchor check

05

Wall padding

06

Lighting

07

Score systems

08

Storage carts

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Goals move during use

Check restraint/anchoring system and operating procedure.

02

Ball rebound from walls unsafe

Review run-off, wall protection and containment.

03

Floor too slippery

Review cleaning, finish and contamination.

04

Lighting flicker on camera

Test driver/flicker performance and camera settings.

05

Congested bench zone

Review substitution/team/scorer geometry.

06

Goals hard to store

Review folding/demounting design, trolley and storage doors.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

FIFA Futsal

Use current FIFA Futsal Laws of the Game and competition requirements for the intended event level.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project