Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · CRICKET · TECHNICAL DIAGRAM PACK

Four vector planning sheets for cricket facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Cricket planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-CRICKET
SPORTCricket
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · FACILITY-SYSTEM PLANNING PLANCricket ground + practice systems diagram01Practice lane / wicket02Side + roof netting03Sight screens04Bowling / coaching equipmentNO SINGLE UNIVERSAL RECTANGLE IS SHOWN FOR THIS FACILITY TYPE.01 · Match ground, wicket square and boundary geometry are venue/competition specific.02 · Practice lanes require their own run-up, side-net, roof-net and safe circulation design.03 · Indoor academy planning should start from lane count, run-up length and net containment.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONPractice-lane / match-support sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYNet containment, ball trajectory, lighting and player circulation
Match grounds, outdoor practice and indoor academies require different sections and containment strategies.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentCricketPLAYING / PERFORMANCE CORE01
Practice lane / wicket
02
Side + roof netting
03
Sight screens
04
Bowling / coaching equipment
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScore display · Coaching camerasCOORDINATION NOTESBoundary viewing · Pavilion / hospitality · Score display · Coaching camerasFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project