Cricket
Facility Specification Pack

Cricket facilities range from one practice lane to international grounds. This centre separates match-ground infrastructure, outdoor practice, indoor academies and support buildings so each can be designed around player throughput and the applicable playing conditions.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERCricket Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/club practice lanes with safe containment, durable surface and storage.

02Clubs · academies · universities

Club / academy

Academy / multi-lane centre with lighting, coaching, video and performance support.

03Regional · national competition

Competition

Club/regional ground with match infrastructure, pavilion, scoreboard, spectators and practice facilities.

04International · professional · broadcast

Elite / major venue

Major venue with match/broadcast lighting, FÍSVOR, media, high-performance practice and event operations.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Separate match ground, pitch square, practice run-ups, net lanes, sight lines, boundary/spectator zones and indoor training clearances.

02

surface

Practice systems may use synthetic, natural or indoor surfaces; match wickets/outfields require specialist agronomy and competition-specific management.

03

equipment

Cage/net structures, lane dividers, sight screens, stumps, covers, team shelters and boundary equipment need safe movement, anchoring and storage.

04

lighting

Practice, indoor and match lighting have different glare, vertical ball visibility and camera requirements.

05

spectators

Protect spectators from ball impact while preserving viewing, circulation, pavilions and hospitality.

06

structure

Outdoor net frames, retractable indoor netting, lighting, scoreboards and pavilions need project-specific structural and service coordination.

07

environment

Wind, rain, heat, sun orientation and ground moisture strongly affect practice and match operations.

08

accessibility

Accessible spectator, pavilion and circulation routes need to coexist with secure player/ball-control zones.

09

storage

Screens, covers, nets, bowling machines, maintenance equipment and training aids require substantial secure storage.

10

technology

FÍSVOR scoring/video, coaching analysis, cameras, replay and network systems can scale from academy to stadium.

11

evidence

Use current ICC playing conditions for international competition context; facility products and local building/net structures retain separate evidence and engineering.

12

lifecycle

Netting, frames, practice surfaces, wickets/outfields, screens, lighting, scoring and pavilions each require separate maintenance plans.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Match / practice / indoor academy

02

Player level and throughput

03

Lane count

04

Pitch/surface pathway

05

Net containment

06

Lighting

07

Sight screens

08

Scoring / analysis

09

Pavilion/support spaces

10

Spectators

11

Maintenance/storage

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Practice-lane plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Netting elevations/sections

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Indoor retractable-net plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Match-ground support layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Pavilion relationship

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Sight-screen positions

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Storage plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Net inspection

02

Frame/anchor inspection

03

Practice surface care

04

Wicket/outfield specialist programme

05

Sight-screen maintenance

06

Lighting

07

Score/display

08

Equipment inventory

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Balls escape practice cage

Review net mesh, overlaps, roof net, frame gaps and lane-end geometry.

02

Netting sags

Check cable/tension, support spacing, wear and weather load.

03

Indoor glare

Review lighting direction, background and net visibility.

04

Practice surface inconsistent

Review base, wear, moisture and maintenance.

05

Congested academy

Review run-ups, lane width, coach zones and player circulation.

06

Score/display visibility poor

Review sightline, sun, brightness and viewing distance.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

ICC Playing Conditions

Current ICC men's and women's playing conditions and regulations; October 2026 editions are listed for the major international formats.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project