LUTHVAR · COMBAT SPORTS · TECHNICAL DIAGRAM PACK

Four vector planning sheets for combat sports facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Combat Sports planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-COMBAT-SPORTS
SPORTCombat Sports
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · FACILITY-SYSTEM PLANNING PLANCombat-sports contest + circulation diagram01Ring / tatami system02Warm-up / training03Officials / medical04Equipment storageNO SINGLE UNIVERSAL RECTANGLE IS SHOWN FOR THIS FACILITY TYPE.01 · Ring sports, tatami sports and grappling/martial-arts formats have different competition areas and safety zones.02 · Athlete, coach, medical, officials and public circulation should be separated before event seating is fixed.03 · Exact governing-body rules determine the final contest-area and equipment configuration.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONContest-area + safety perimeter sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYRing / tatami, impact system, officials and spectator separation
Combat disciplines use different rings, tatami and safety zones, so the facility must start from the exact discipline rules and coordinate floor, structure, lighting and event circulation.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentCombat SportsPLAYING / PERFORMANCE CORE01
Ring / tatami system
02
Warm-up / training
03
Officials / medical
04
Equipment storage
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYScoring / judging · TimingCOORDINATION NOTESSafety perimeter · Athlete / public separation · Scoring / judging · TimingFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.