Skip to main content
Apollo NZ Global

LUTHVAR · GLOBAL SPORTS TECHNICAL LIBRARY

Combat Sports
Facility Specification Pack

Combat-sports facilities vary sharply by discipline—ring sports, tatami sports, grappling, boxing-style and martial-arts pathways all have different competition areas and safety requirements. The facility should start from the exact discipline and governing rules rather than a generic mat room.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERCombat Sports Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

Community/club training room with safe mats, supervision and equipment storage.

02Clubs · academies · universities

Club / academy

Academy with multiple training zones, bag/ring areas, strength support and spectators.

03Regional · national competition

Competition

Competition-capable venue configured to the exact discipline and governing-body rules.

04International · professional · broadcast

Elite / major venue

Major event arena with rings/tatami, warm-up, medical, officials, spectators, display and broadcast.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Define the exact discipline, ring/tatami/contest area, safety margin, warm-up, officials and athlete circulation from the applicable rules.

02

surface

Mats, ring canvas/platforms and impact flooring should match discipline, fall/footwork demands and cleaning requirements.

03

equipment

Rings, cages where applicable, ropes/padding, tatami mats, bags, judging tables and protective equipment need exact evidence and safe setup.

04

lighting

Provide even visibility with minimal glare to athletes, judges and cameras; avoid shadows across rings/tatami.

05

spectators

Separate athletes, coaches, officials, medical access and spectators around competition areas.

06

structure

Raised rings/platforms, suspended bags, lighting, scoreboards and spectator systems require structural coordination.

07

environment

Ventilation, temperature, humidity, cleaning and odour control are significant operational factors in high-use facilities.

08

accessibility

Accessible venue circulation, viewing and inclusive/adaptive programmes should be incorporated where relevant.

09

storage

Mats, rings/components, bags, pads, protective equipment and event furniture require hygienic, secure storage.

10

technology

Timing, scoring, judging, FÍSVOR displays, PA and cameras should match the exact discipline/event workflow.

11

evidence

Use the governing body for the exact combat discipline. WAKO, for example, publishes separate ring/tatami rules and current rule-change notices.

12

lifecycle

Inspect mats, ring/platform, ropes/padding, anchors, bags, timing/scoring, lighting and cleaning/hygiene controls.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Combat discipline

02

Training / competition

03

Contest-area geometry

04

Mat / ring system

05

Safety margins

06

Warm-up / athlete flow

07

Lighting

08

Scoring / timing

09

Medical / officials

10

Spectators

11

Storage / hygiene

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Contest-area plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Ring/tatami section

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Safety-margin plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Lighting plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Athlete/official/medical flow

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Spectator layout

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Scoring / AV schematic

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

08

Storage plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Mats / canvas

02

Ring/platform

03

Ropes/padding

04

Anchors / suspended equipment

05

Cleaning/hygiene

06

Lighting

07

Timing/scoring

08

Storage

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Mats separate / gap

Stop use in affected area and review joins/restraint and floor flatness.

02

Ring movement

Inspect frame, platform and anchoring before further use.

03

Poor hygiene / odour

Review cleaning chemistry, drying, ventilation and storage.

04

Lighting glare

Review aiming and fixture position relative to athletes/judges.

05

Event circulation conflict

Separate athlete, medical, officials and public routes.

06

Wrong competition setup

Verify the exact discipline rule book rather than using a generic combat-sport layout.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

WAKO Rules Overview

Official WAKO rules portal covering discipline rules, ring/tatami pathways and 2026 rule changes; other combat disciplines require their own governing source.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project