Skip to main content
Apollo NZ GlobalStart Project Brief
All diagram packs

LUTHVAR · AQUATICS · TECHNICAL DIAGRAM PACK

Four vector planning sheets for aquatics facility coordination.

Download individual SVG sheets or print/save the complete diagram pack. Current governing rules and exact project/system drawings take precedence.
Open technical centre

TECHNICAL DIAGRAM PACK

Aquatics planning diagrams for the interfaces that written specifications miss.

Four vector sheets cover plan geometry, vertical coordination, equipment/operations and spectator/technology interfaces. Verified sport dimensions are shown only where the technical baseline supports them; conceptual allowances remain explicitly labelled.

PACKLTV-AQUATICS
SPORTAquatics
REFERENCE REVIEW04 OCT 2026
STATUSPLANNING / COORDINATION
01

Dimensioned Plan

01 · FACILITY-SYSTEM PLANNING PLANAquatic competition-system coordination plan01Starting blocks02Lane / backstroke systems03Timing touchpads04Water-polo / discipline equipmentNO SINGLE UNIVERSAL RECTANGLE IS SHOWN FOR THIS FACILITY TYPE.01 · Pool dimensions and water treatment are discipline/project specific.02 · Starting, lane, timing and display systems must be coordinated with the pool shell and deck.03 · Humidity and chlorides affect seating, electronics, fixings and service access.
02

Vertical / Section Coordination

02 · VERTICAL / SECTION COORDINATIONPool / deck / spectator sectionPLAYING / PERFORMANCE ZONECOORDINATION VOLUMEVERIFY REQUIRED VERTICAL ENVELOPELSTLIGHTINGSTRUCTURE / SERVICESTECHNOLOGYPool shell, deck, starting, timing, displays and humid-environment seating
Pool engineering remains specialist/local; Apollo coordinates the competition systems it supplies around the pool and venue.
03

Equipment + Operations Zoning

03 · EQUIPMENT + OPERATIONS ZONINGSystem interfaces around the playing environmentAquaticsPLAYING / PERFORMANCE CORE01
Starting blocks
02
Lane / backstroke systems
03
Timing touchpads
04
Water-polo / discipline equipment
OPERATIONS CHECKShow deployed + parked equipment, handling routes, doors/gates, maintenance access and the person responsible for each system.
04

Spectator + Lighting + Technology

04 · SPECTATOR + LIGHTING + TECHNOLOGYSightlines, light, display and operational separationPLAYING / PERFORMANCE ZONESPECTATORSSPECTATORSLIGHT / CAMERALIGHT / CAMERAVENUE TECHNOLOGYTiming / results · FÍSVORCOORDINATION NOTESWet-deck separation · Officials / athlete deck · Timing / results · FÍSVORFinal sightlines, lux/vertical illuminance, egress, accessible viewing, structural support and display brightness remain project-specific.
Planning diagram status

These diagrams organise coordination information. They are not fabrication drawings, engineering drawings, construction details, certified court/field layouts or statutory documentation. Current governing-body requirements, exact selected-system drawings and local professional design take precedence.

Project