Aquatics
Facility Specification Pack

Competition aquatics connects the pool shell and water treatment to starting, lanes, timing, results, water polo, deck operations, spectators and dryland support. Apollo's role is supply-side coordination of the systems it provides, not local pool engineering.

OWNERApollo NZ Global · LUTHVAR
COMMERCIAL MODELWholesale & Project Supply · Supply-only
TECHNICAL OWNERAquatics Facility Technical Centre
PROJECT PATHProject Brief
01

PROJECT INTENT

Define the facility level before selecting systems.

01Schools · councils · participation

Community / education

School/community pool with training lanes and basic competition equipment.

02Clubs · academies · universities

Club / academy

Club/academy facility with stronger starting, timing and dryland support.

03Regional · national competition

Competition

Competition pool with exact starting/lane/timing/results and event-deck planning.

04International · professional · broadcast

Elite / major venue

Major aquatic centre with elite competition, FÍSVOR, broadcast, spectator, water-polo and operations systems.

02

TECHNICAL REQUIREMENTS

Twelve coordination clauses for the complete facility.

01

geometry

Pool length, lane geometry, deck clearances and discipline-specific requirements must come from the current competition brief and local pool designer.

02

surface

Wet-deck slip resistance, pool-edge interfaces and aquatic equipment mounting are specialist interfaces separate from ordinary sports flooring.

03

equipment

Starting blocks, lane ropes, backstroke systems, water-polo goals/field equipment and deck hardware need exact compatibility with the pool structure.

04

lighting

Competition/broadcast lighting must manage water reflection, glare and camera sightlines.

05

spectators

Plan humid-environment seating, accessible viewing, deck separation and event circulation.

06

structure

Starting anchors, lane sockets, display supports and spectator structures need coordination with the pool shell/building.

07

environment

Humidity, chlorides, condensation and corrosion control are fundamental material-selection inputs.

08

accessibility

Accessible wet-deck circulation, viewing and pool-access systems belong in the overall facility plan.

09

storage

Lane ropes, goals, timing gear and deck equipment require wet-compatible storage and handling routes.

10

technology

Timing touchpads, starting, results, FÍSVOR display, PA and data systems should be developed as one competition-control architecture.

11

evidence

Use current World Aquatics Competition Regulations and discipline documents; exact equipment approval and local pool compliance remain separate.

12

lifecycle

Control chloride exposure, rinse/dry equipment, inspect fixings/cables/touchpads, service timing, maintain lane ropes and manage spare electronic modules.

03

PROJECT INPUT SCHEDULE

Information to obtain before the exact system is released.

01

Discipline mix

02

Pool course length

03

Competition level

04

Lane count

05

Starting systems

06

Timing/results

07

Water polo / other disciplines

08

FÍSVOR / PA

09

Spectators

10

Corrosion environment

11

Storage / dryland

04

DRAWING & SUBMITTAL ROADMAP

Draw the interfaces that can create procurement errors.

01

Pool/equipment plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

02

Starting-block interface

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

03

Lane-anchor schedule

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

04

Timing/data schematic

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

Display/sightline plan

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

06

Deck/spectator separation

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

07

Equipment storage

Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.

05

EVIDENCE & RELEASE

Keep each evidence type attached to what it actually proves.

01

Governing rule

Defines sport or competition requirements. It does not approve a supplier or local construction detail.

02

Exact product evidence

Testing, approval, certification or manufacturer evidence must match the selected product/configuration.

03

Installed outcome

Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.

04

Project engineering

Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.

05

Commercial release

Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.

06

MAINTENANCE & HANDOVER

Specify how performance will be maintained.

01

Rinse/dry equipment

02

Corrosion inspection

03

Lane-rope maintenance

04

Starting blocks

05

Timing/touchpads

06

Cables/connectors

07

Displays/PA

08

Storage

07

TECHNICAL RISK CHECK

Common symptoms that should trigger investigation.

01

Electronic timing intermittent

Inspect connectors, water ingress, cabling, controller and touchpad.

02

Corrosion

Review material grade, chlorine exposure, drainage and rinse/maintenance.

03

Display hard to see

Review brightness, reflection, sightline and mounting.

04

Deck congestion

Review officials, athlete, equipment and spectator circulation.

05

Lane hardware loosens

Inspect anchors, tension and pool-shell interface.

06

Equipment storage damages gear

Review wet/dry separation, racks and handling.

08

PRIMARY GOVERNING REFERENCES

Verify final requirements at the official source.

World Aquatics Competition Regulations

Current Competition Regulations Version February 2026 and discipline updates.

World Aquatics Swimming Documents

Current competition, warm-up and officiating documents for swimming.

SUPPLY BOUNDARY

Apollo is supply-only.

Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.

Project