What is SARENTA SPAN · Food & FMCG Storage?
Food and FMCG storage application supported by completed case studies. No food-grade, cold-store or hygiene certification is implied unless confirmed for…
Start Project BriefFood · FMCG · inventory
Current SARENTA applications include repeated food-warehousing and FMCG storage projects. SARENTA SPAN can use the same clear-span platform where hygiene, climate, pallet movement and secure enclosure are defined in the brief.

Direct project answers
Food and FMCG storage application supported by completed case studies. No food-grade, cold-store or hygiene certification is implied unless confirmed for…
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Established application
Current SARENTA project experience includes multiple food-warehousing tent projects and a dedicated FMCG storage project series.
Project priorities
Ambient, temperature-sensitive, humidity-sensitive and regulated goods create different enclosure and service requirements.
Wall interfaces, doors, floor condition and operational housekeeping need to suit the product and local food-storage rules.
Pallet positions, forklifts, loading bays and turning clearances should be established before finalising doors and bay rhythm.
Lighting, ventilation, cooling or monitoring systems are specified separately against actual warehouse operations.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Hard-wall / membrane options
Large roller-door pathways
Lighting
Ventilation / AC pathway
Insulated liner option
Project engineering
Installation documentation
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.