Product condition
Ambient, temperature-sensitive, humidity-sensitive and regulated goods create different enclosure and service requirements.
Start Project BriefFood · FMCG · inventory
Supplier case material includes repeated food-warehousing and FMCG storage projects. SARENTA SPAN can use the same clear-span platform where hygiene, climate, pallet movement and secure enclosure are defined in the brief.

Supplier-demonstrated
The supplier company profile shows multiple food-warehousing tent projects and a dedicated FMCG storage project series.
Project priorities
Ambient, temperature-sensitive, humidity-sensitive and regulated goods create different enclosure and service requirements.
Wall interfaces, doors, floor condition and operational housekeeping need to suit the product and local food-storage rules.
Pallet positions, forklifts, loading bays and turning clearances should be established before finalising doors and bay rhythm.
Lighting, ventilation, cooling or monitoring systems are specified separately against actual warehouse operations.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Hard-wall / membrane options
Large roller-door pathways
Lighting
Ventilation / AC pathway
Insulated liner option
Project engineering
Installation documentation
Shared SARENTA platform
SARENTA uses supplier-confirmed 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.