What is SARENTA PROJECT · Worship & Assembly?
Worship and assembly pathway supported by the documented church-tent category and large assembly case projects.
Start Project BriefWorship · assembly · congregation
The current SARENTA range includes church-tent structures, while the wider event portfolio demonstrates large seated assembly structures. SARENTA PROJECT can use that platform for worship and assembly briefs subject to local occupancy, fire and building requirements.

Direct project answers
Worship and assembly pathway supported by the documented church-tent category and large assembly case projects.
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Established application
The current SARENTA range includes church-tent structures and the project portfolio shows large seated public-assembly halls.
Project priorities
Capacity, exit width, emergency routes, accessibility and fire strategy need local professional design.
Speech, music, sound reinforcement and visual systems should be coordinated with the membrane / wall environment.
Ventilation, cooling, lighting and insulation can dominate user experience in warm climates.
Temporary, semi-permanent and permanent use require different anchoring, foundations and statutory pathways.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Clear-span hall structure
Wall / glazing options
Insulated liner option
Doors
Lighting / AV coordination
Project engineering
CAD + installation manuals
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.