What is SARENTA PROJECT · Temporary Project Facilities?
Apollo-developed project-facility pathway using documented event and warehouse structures.
Start Project BriefProject site · temporary facility · rapid deployment
SARENTA PROJECT can adapt the documented clear-span warehouse and event structure capability to selected project-site facilities where rapid deployment and clear internal space matter.

Direct project answers
Apollo-developed project-facility pathway using documented event and warehouse structures.
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Project application
This application combines documented warehouse and event structures. Exact occupancy and use determine whether the system is suitable for offices, assembly, storage or other project functions.
Project priorities
Storage, office, welfare and public assembly uses are not interchangeable; fire, sanitation and comfort requirements differ.
Temporary, semi-permanent and permanent intent must be declared before anchoring and engineering are selected.
Demountability can be planned, but repeated relocation requirements should be confirmed before the final system is specified.
Foundations, electrical, plumbing, HVAC, fire systems and internal fit-out remain separately scoped unless expressly included.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Clear-span shell
Temporary anchoring pathways
Wall + door options
Insulated liner option
Lighting / AC pathway
CAD
Installation manuals
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.