Crowd model
Capacity, arrival, circulation, queuing, emergency egress and accessible routes drive the site plan before individual structures are selected.
Start Project BriefLarge assembly · fan village · public event
SARENTA EVENT can support large public gatherings, fan villages and multi-hall event programmes where repeated modular structures, crowd movement and supporting event infrastructure matter.

Supplier-demonstrated
The supplier profile includes a World Cup fan-village project and large-scale outdoor event halls with substantial seated assembly layouts.
Project priorities
Capacity, arrival, circulation, queuing, emergency egress and accessible routes drive the site plan before individual structures are selected.
Repeated halls, linked zones, food and beverage, toilets, security and service routes need precinct-level coordination.
Barriers, flooring, seating, power, lighting, LED and communication systems should be coordinated with the structure package.
Occupancy, fire, crowd safety and temporary-structure approvals remain with the destination project team and local authorities.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Multiple clear-span structures
Event flooring
Doors + egress
Lighting truss
Stage zones
Glass / wall systems
Venue-infrastructure coordination
Shared SARENTA platform
SARENTA uses supplier-confirmed 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.