What is SARENTA EVENT · Exhibition & Trade Show?
Exhibition structure pathway based on documented exhibition and large-event projects. Final span, access, flooring, display loads, lighting, HVAC, wall…
Start Project BriefExhibition · trade show · temporary venue
SARENTA EVENT can form temporary or semi-permanent exhibition halls where the structure, entrance, flooring, services, lighting and internal exhibition layout are coordinated as one project.

Direct project answers
Exhibition structure pathway based on documented exhibition and large-event projects. Final span, access, flooring, display loads, lighting, HVAC, wall…
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Established application
Current SARENTA project experience includes a dedicated exhibition-tent case and multiple large-scale event structures used for public events and temporary venues.
Project priorities
Entrances, aisles, exhibitor zones, emergency routes and service access shape the usable hall plan.
Rigging, displays, lighting, temporary rooms, power and floor loads need to be declared before structural and fit-out coordination.
Ventilation, cooling, insulation and door strategy should match occupancy, climate and operating hours.
Anchoring, wall system, foundation pathway and engineering level change with intended duration and local requirements.
Supply package pathway
Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.
Temporary event flooring
Glass / hard-wall pathways
Lighting truss
Doors + entrances
Ceiling lining
AC pathway
Stage / presentation zones
Shared SARENTA platform
SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.
Plan · specify · compare
Project review
Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.