Dock leveller systems

TREVIK / Industrial loading / Technical centre

Dock Leveller Selection & Pit Planning

A practical specification workflow for hinged-lip, telescopic-lip, vertical-storing and manual loading interfaces. Gather vehicle, civil and load information before asking a manufacturer to select the equipment.

01 / Understand the mechanisms

Four different levelling pathways.

No single type is automatically suitable for a specific truck fleet, pit, temperature regime or loading operation.

01 / TECHNICAL FAMILY

Hinged-lip leveller

A hinged front lip is raised during the operating cycle, then set onto a suitable truck/trailer bed. Selection depends on vehicle reach, travel range and verified operating-duty limits.

Verify before selection

Lip hinge, lip length, deck travel, trailer landing contact and forklift/wheel-load evidence.

02 / TECHNICAL FAMILY

Telescopic-lip leveller

An extending lip allows controlled placement onto the vehicle bed. It is considered where precise overlap or trailer configurations make lip positioning important.

Verify before selection

Extension length, permitted overlap, controls, mechanical travel and tested load rating.

03 / TECHNICAL FAMILY

Vertical-storing leveller

A stored-upright arrangement may help separate external loading from a temperature-managed building, if compatible with the door, dock and thermal design.

Verify before selection

Storage and deployment sequence, enclosure, pit geometry, local guarding and refrigeration interface.

04 / TECHNICAL FAMILY

Manual leveller or bridge

Manual docking equipment is a separate pathway for limited duty and suitable vehicle geometries; it is not a default substitute for powered pit levellers.

Verify before selection

Operating method, physical handling, rated capacity, fall protection, storage and manufacturer instructions.

02 / Supplier-ready specification brief

Record the site and real load conditions.

Enter what is known. Unknown measurements are acceptable at this stage, but a manufacturer cannot approve the configuration until the missing information is resolved.

Loading dock input schedule
0 / 8 essential fields supplied

Readiness is a data check, not engineering approval. 8 essential fields still require input. Actual total loading-equipment mass does not by itself establish rated capacity: wheel contact, dynamic loads, manufacturer methodology and applicable safety standards must also be checked.

Send preliminary brief to Apollo

03 / Evidence before manufacture

Technical release should require a specific-model submittal.

Manufacturer drawings, pit and frame dimensions, anchor/structural reactions, actual rated capacity and wheel-load assumptions, lip type/travel, operating controls, emergency procedures, warranty and maintenance documents all need approval by the appropriate project parties.

Open TREVIK submittal register