Household count and occupancy
RHELGAN · HOUSING WATER
Housing Water Systems
Water storage, treatment, pumping and distribution for individual homes, housing clusters and programme-scale residential developments where utility reliability, climate and long-term maintenance need to be planned with the buildings.
Where it fits
Applications that benefit from this pathway.
Selection factors
Define these before equipment is fixed.
Indoor and outdoor water uses
Source type and reliability
Storage autonomy
Distribution distance and elevation
Rainwater catchment potential
Power availability
Maintenance and operator model
Specification controls
Keep the public pathway useful without turning planning data into guarantees.
Household count is a planning input, not a fixed litres-per-day rule.
Shared systems can be more maintainable than many isolated systems where housing density allows it.
Rainwater, bore and municipal top-up can be combined only with controlled interfaces and clear operating logic.
Final storage, treatment and pressure strategy should be coordinated with the housing masterplan.
Working resources
Carry this section through design, procurement and handover.
Source-Water Review
Structure source, testing, seasonal reliability and treatment questions before equipment is selected.
Open reviewDemand & Storage Planner
Turn demand and storage autonomy into a transparent planning range.
Open plannerSpecification Template
Use one controlled schedule for storage, treatment, pumping, controls and project interfaces.
Open templateResponsibility Matrix
Separate supplied equipment from civil works, pipework, power, approvals and operations.
Open matrixInstallation & Commissioning
Plan site readiness, assembly, cleaning, testing and water-quality verification.
Open commissioningOperations & Maintenance
Define routine checks, consumables, spares, alarms and operator ownership.
Open O&MResidential water infrastructure should be sized from actual occupancy, use, source reliability and autonomy rather than from tank size or dwelling count alone.
Final equipment, material, capacity, certification, drawings, performance and commercial scope are confirmed against the exact project configuration.
RHELGAN · WATER STORAGE & SUPPLY SYSTEMS
