Plan handover before the equipment reaches site.

Installation quality is controlled by released project information, prepared civil works, clear responsibility boundaries and documented commissioning. The aim is a working water system with traceable checks — not simply assembled equipment.

SITE READYFoundations · access · services
SYSTEM READYStorage · treatment · pumps · controls
HANDOVER READYTests · records · training · spares

Commissioning sequence

Nine controlled stages from receiving to handover.

The exact inspection and test plan changes with the system. These stages provide the project structure, while the released manufacturer and engineering documents govern the selected configuration.

01

01 · Pre-installation review

Confirm released drawings, storage geometry, foundation readiness, lifting / access, services, pipe interfaces and the latest project documentation before equipment is opened or assembled.

02

02 · Receiving + inspection

Check packing lists, visible transit damage, panel / fitting identity, pump and treatment components, instruments, loose accessories and preservation requirements.

03

03 · Civil + support readiness

Verify foundations, slabs, plinths, support levels, drainage, anchors and maintenance access against the released project requirements.

04

04 · Mechanical assembly

Assemble storage, pipework, valves, pumps, treatment equipment and supports in the controlled sequence for the selected system.

05

05 · Electrical + controls

Complete power, protection, earthing, level controls, pump controls, alarms, sensors and communications to the destination requirements and released drawings.

06

06 · Cleaning + preparation

Clean tanks, pipework and wetted components as required by the project plan before water is introduced for commissioning.

07

07 · Functional commissioning

Prove filling, level controls, pumps, duty / standby changeover, pressure control, alarms, valves, overflow, drains and treatment operating sequences.

08

08 · Performance + water quality

Verify system flow / pressure and treatment outputs against the agreed project criteria using the appropriate test and sampling plan.

09

09 · Training + handover

Transfer manuals, drawings, settings, spare parts, maintenance schedules, test records, operator training and outstanding actions to the responsible project team.

Hold points

Do not let critical checks disappear inside the programme.

Hold points are agreed project controls. They make it clear when work can proceed and which records should exist before the next stage.

01

Foundation / support acceptance before tank assembly

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

02

Tank assembly inspection before filling

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

03

Pipe pressure / leak checks before concealment or handover

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

04

Electrical protection and control checks before live operation

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

05

Treatment process verification before drinking-water release where applicable

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

06

Final document, spares and operator-training handover

Record the acceptance, responsible party, supporting evidence and any open corrective action before release.

Responsibility boundaries

Assign the interfaces before site work starts.

Project / local works

  • Survey, earthworks, foundations and site drainage
  • Destination approvals and local engineering
  • Site electrical supply and external utility connections
  • Local pipe networks outside the defined equipment scope
  • Safe access, lifting and temporary works

Configured equipment package

  • Released equipment and component schedule
  • Assembly / installation documentation for supplied equipment
  • Defined controls and instruments
  • Project-specific spares and manuals where included
  • Factory / pre-dispatch documentation defined in the scope

Commissioning

  • Agreed functional checks
  • Pump, valve and control verification
  • Treatment process startup where included
  • Project water-quality verification where applicable
  • Defect / action register and closeout

Handover

  • As-built / final released drawings where included
  • Operating and maintenance information
  • Test and commissioning records
  • Warranty and serial / equipment records
  • Operator training and spare-parts handoff

Commissioning record

Capture what was actually commissioned.

Site + equipment identity

Project reference, location, equipment IDs, tank / pump / treatment configuration and installation date.

Operating settings

Pressure setpoints, level controls, pump sequence, treatment settings, alarm points and any project-approved controller values.

Test results

Functional checks, leak / pressure checks where required, measured flows, alarms, treatment verification and corrective actions.

Handover status

Outstanding work, spares issued, operator training, maintenance schedule and responsible operating organisation.

RHELGAN · WATER PROJECT DELIVERY

Need the operating framework that follows commissioning?

Open Operations & Maintenance Evidence & Documentation