Project type, geometry and edge condition
ORDRAN + AUREMONT · PROJECT AUTHORITY CENTRE
Move from product interest to a controlled project specification.
Choose between standard modular and made-to-measure architectural pool pathways, then coordinate shell/support, slab, hydraulics, water treatment, windows, lifting, transport, backfill/fill sequence and local pool compliance.
01 · PROJECT INPUTS
Define the conditions before the exact system is released.
These inputs are deliberately upstream of model selection so the product does not dictate the brief.
Pool dimensions, depth profile and stairs/bench features
Site levels, access and crane/handling constraints
Ground condition, slab/support and drainage strategy
Hydraulic/treatment concept and plant-room location
Window size/location/depth where applicable
Transport route, container/section strategy and site receiving
Local barrier, electrical, structural and pool-water requirements
02 · EVIDENCE CONTROL
Keep project claims attached to what the evidence actually proves.
Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.
Exact shell/support-frame construction evidence
Project-specific support/slab/foundation requirements
Hydraulic/treatment component documentation
Window material/thickness/seal evidence for the selected opening
Lifting/handling instructions for the exact pool
Water chemistry and corrosion-control limits
Warranty/QA and installation-sequence requirements
03 · CAD / DRAWING REGISTER
Planning references are not exact-system construction drawings.
Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.
| Resource | Status | Purpose |
|---|---|---|
| Pool concept / planning layout | Public planning | Early scope, interface and consultant coordination only. |
| Generic technical reference / typical detail | Public planning | Explains system logic without representing an exact supplied configuration. |
| Exact-system GA / dimensional drawing | Exact-system | Issued only after the quoted system/configuration is known. |
| Native CAD / DWG / DXF | Verify availability | Availability and revision must be confirmed against the exact supplied system. |
| BIM / Revit / IFC object | Verify availability | Only described as BIM where a genuine verified native model exists. |
| Foundation / fixing / setting-out drawing | Project-specific | Depends on site/building conditions, local engineering and the selected system. |
| Services / electrical / controls interface | Project-specific | Coordinates the supplied system with local power, data, water, drainage or controls. |
04 · SPECIFICATION STARTER
Write the project around performance, interfaces and evidence.
These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.
Pool geometry and waterline/edge condition
Shell/support-frame construction
Base/slab/support criteria
Hydraulics and treatment interface
Window/feature requirements
Lifting/transport/site access
Backfill and synchronous water-fill sequence where applicable
Electrical/bonding/local safety interfaces
QA, water chemistry, warranty and handover
05 · TENDER / RFP SCHEDULE
Ask bidders for the same controlled information.
A consistent schedule makes technical comparison easier and reduces hidden assumptions.
Pool schedule / dimensions
Site plan/levels/access
Structural/geotechnical information
Plant/hydraulic requirements
Window/feature schedule
Transport/lifting constraints
Local compliance responsibilities
Installation sequence
Water-treatment and handover documentation
06 · OPERATIONS & HANDOVER
Specify how the system will be maintained after delivery.
Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.
Water chemistry log
Treatment/filtration maintenance
Shell/window/seal inspection
Corrosion and exposed-frame inspection
Drainage / hydrostatic-risk controls
Cover/accessory maintenance
Plant spare-parts register
Periodic structural/support visual inspection
DOWNLOADABLE PROJECT RESOURCE
Carry the authority pack into the project file.
Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.