ORDRAN + AUREMONT · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Choose between standard modular and made-to-measure architectural pool pathways, then coordinate shell/support, slab, hydraulics, water treatment, windows, lifting, transport, backfill/fill sequence and local pool compliance.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Project type, geometry and edge condition

02

Pool dimensions, depth profile and stairs/bench features

03

Site levels, access and crane/handling constraints

04

Ground condition, slab/support and drainage strategy

05

Hydraulic/treatment concept and plant-room location

06

Window size/location/depth where applicable

07

Transport route, container/section strategy and site receiving

08

Local barrier, electrical, structural and pool-water requirements

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact shell/support-frame construction evidence

02

Project-specific support/slab/foundation requirements

03

Hydraulic/treatment component documentation

04

Window material/thickness/seal evidence for the selected opening

05

Lifting/handling instructions for the exact pool

06

Water chemistry and corrosion-control limits

07

Warranty/QA and installation-sequence requirements

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Pool concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Pool geometry and waterline/edge condition

02

Shell/support-frame construction

03

Base/slab/support criteria

04

Hydraulics and treatment interface

05

Window/feature requirements

06

Lifting/transport/site access

07

Backfill and synchronous water-fill sequence where applicable

08

Electrical/bonding/local safety interfaces

09

QA, water chemistry, warranty and handover

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Pool schedule / dimensions

02

Site plan/levels/access

03

Structural/geotechnical information

04

Plant/hydraulic requirements

05

Window/feature schedule

06

Transport/lifting constraints

07

Local compliance responsibilities

08

Installation sequence

09

Water-treatment and handover documentation

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Water chemistry log

02

Treatment/filtration maintenance

03

Shell/window/seal inspection

04

Corrosion and exposed-frame inspection

05

Drainage / hydrostatic-risk controls

06

Cover/accessory maintenance

07

Plant spare-parts register

08

Periodic structural/support visual inspection

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project