Architectural & Modular Pool Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

ORDRAN + AUREMONT

Architectural & Modular Pool Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Project type, geometry and edge condition
  2. Pool dimensions, depth profile and stairs/bench features
  3. Site levels, access and crane/handling constraints
  4. Ground condition, slab/support and drainage strategy
  5. Hydraulic/treatment concept and plant-room location
  6. Window size/location/depth where applicable
  7. Transport route, container/section strategy and site receiving
  8. Local barrier, electrical, structural and pool-water requirements
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Pool geometry and waterline/edge condition
  2. Shell/support-frame construction
  3. Base/slab/support criteria
  4. Hydraulics and treatment interface
  5. Window/feature requirements
  6. Lifting/transport/site access
  7. Backfill and synchronous water-fill sequence where applicable
  8. Electrical/bonding/local safety interfaces
  9. QA, water chemistry, warranty and handover
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact shell/support-frame construction evidence
  2. Project-specific support/slab/foundation requirements
  3. Hydraulic/treatment component documentation
  4. Window material/thickness/seal evidence for the selected opening
  5. Lifting/handling instructions for the exact pool
  6. Water chemistry and corrosion-control limits
  7. Warranty/QA and installation-sequence requirements
04

DRAWING / CAD / BIM REGISTER

  1. Pool concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Pool schedule / dimensions
  2. Site plan/levels/access
  3. Structural/geotechnical information
  4. Plant/hydraulic requirements
  5. Window/feature schedule
  6. Transport/lifting constraints
  7. Local compliance responsibilities
  8. Installation sequence
  9. Water-treatment and handover documentation
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Water chemistry log
  2. Treatment/filtration maintenance
  3. Shell/window/seal inspection
  4. Corrosion and exposed-frame inspection
  5. Drainage / hydrostatic-risk controls
  6. Cover/accessory maintenance
  7. Plant spare-parts register
  8. Periodic structural/support visual inspection

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project