Skip to main content
Apollo NZ GlobalStart Flooring Brief
← Timber Sports FlooringATHREN

ATHREN Timber · Technical Centre

One technical workspace for sprung timber sports flooring.

Use the current construction evidence, technical diagrams, installation planning, competition evidence and project tools together. Unresolved factory details remain held rather than filled with assumptions.

09technical resources
Supply-only project pathwayCurrent construction documents reviewedFIBA Level 2 evidence kept model-specificPerformance values held until test reports arrive

Technical resource library

Build the specification from the floor system outward.

The technical centre separates what the factory documents support today from what still requires model-specific confirmation. This keeps the public floor architecture useful without overstating performance or FIBA scope.

01

Single-Batten System

Approx. 105 mm suspended timber pathway with one 45 × 45 mm batten layer, 19 mm pine subfloor and lower resilient support.

Open resource
02

Double-Batten System

Approx. 158 mm suspended pathway with upper and lower 45 × 45 mm battens, intermediate 8 mm resilient pads and lower resilient support.

Open resource
03

Selection Guide

Project-led selector using sport, competition requirement, available build-up, event use and floor interfaces without inventing a performance hierarchy.

Open resource
04

Technical Data Sheets

Controlled single- and double-batten technical sheets separating documented construction data from project-confirmed items.

Open resource
05

Technical Diagrams

Original ATHREN layer, slab, expansion and ventilation planning diagrams based on the supplied installation documents.

Open resource
06

Installation Planning

Nine-stage planning sequence covering datum, slab, batten set-out, subfloor, moisture layer, playing surface, expansion and ventilation.

Open resource
07

FIBA Evidence

Controlled competition-evidence page for the current fixed-birch Level 2 pathway, without extending approval beyond the supplied certificate.

Open resource
08

Specifier Checklist

Project checklist for slab, moisture, finished level, services, equipment sockets, line marking, perimeter details and evidence control.

Open resource
09

Project Brief

Structured intake for sport, competition requirement, area, available floor depth, slab, moisture, services, equipment and programme.

Open resource

Evidence control

Three evidence states are kept separate.

This is important for timber sports floors because the current construction documents contain a small number of inconsistent values while the FIBA certificate remains exact-model specific.

Documented

Construction

Layer order, nominal floor heights, slab reference flatness, subfloor orientation, moisture membrane, expansion and ventilation pathways.

Documented

Competition evidence

Current certificate supports two fixed birch wooden-floor configurations at FIBA Approved Equipment Level 2 through 31 December 2026.

Held

Factory confirmation

Exact HKFF model mapping, final board thickness, resilient-pad spacing, adjustment range and performance test schedule remain held until confirmed.

Project workflow

Move from technical evidence into the actual hall brief.

Use the specifier checklist first, then complete the project brief with the court and basketball-equipment information before final system selection.

Open Specifier Checklist Open Project BriefDownload PDF Guide
ATHREN
Timber Sports Flooring

Sports & Flooring Systems · By Apollo NZ Global

Contact Apollo
Project